Agroforestry and reforestation with small-scale farmers in Uganda
#32of 261 in Soil carbon#14of 163 in Uganda#329of 1339 in Verra (VCS)
Audit Analysis
A smallholder agroforestry project in Uganda with VVB-confirmed additionality, a 10% buffer pool, and no reported reversals, but constrained by a project-specific baseline, a thin leakage justification, and a first monitoring period that delivered roughly 44% of the pro-rata lifetime expectation. The 90% verification-to-claim ratio and closed corrective actions suggest a functioning MRV system, while several key parameters (FNRB, usage monitoring, CORSIA status) remain unquantified in the available record.
Red Flags
- First monitoring period verified 4,692 tCO2e against a pro-rata expectation of ~10,600 tCO2e (65,216 lifetime × 5.7/35 years), i.e. only ~44% of the expected delivery for the elapsed period, suggesting the PDD baseline may have been optimistic
- Leakage deduction of 0% is justified only as 'deemed negligible' with no quantified analysis in the available documents
- Nine Corrective Action Requests were raised during verification (all closed), indicating recurring documentation or methodology issues
- FNRB value and method are not stated in any available document, preventing cross-check against national defaults
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 334 | 0 | 334 | |
| 2018 | 702 | 0 | 702 | |
| 2019 | 942 | 0 | 942 | |
| 2020 | 1,345 | 0 | 1,345 | |
| 2021 | 1,360 | 0 | 1,360 | |
| Total | 4,683 | 0 | 4,683 |
Risk Indicators
VVB-confirmed barrier test
10% buffer, no reversals
0% deduction, thin justification
Project-specific, not yet due for reassessment
FPIC and grievance mechanism documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →