Top Uganda projects
61 rated projects in this country · average rating 3.9/10 · ranked by CarbonMeld's document-based rating: additionality, quantification, permanence (where carbon is stored) and claim safety. Showing the top 50.
- 4 6.8
- 5 6.8
- 6 6.8
- 7 6.8
- 8 6.8
- 9 5
- 10 4.9
- 11 4.1
- 12 4
- 13 3.9
- 14 3.8
- 15 3.8
- 16 3.8
- 17 3.8
- 18 3.8
- 19 3.8
- 20 3.8
- 21 3.5
- 22 3.5
- 23 3.5
- 24 3.5
- 25 3.5
- 26 3.5
- 27 3.5
- 28 3.5
- 29 3.5
- 30 3.5
- 31 3.5
- 32 3.5
- 33 3.5
- 34 3.5
- 35 3.5
- 36 3.5
- 37 3.5
- 38 3.5
- 39 3.5
- 40 3.5
- 41 3.5
- 42 3.1
- 43 3.1
- 44 3.1
- 45 3.1
- 46 3.1
- 47 3.1
- 48 3.1
- 49 3.1
- 50 3.1
Rank is by document-based rating only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. How we rate projects.
