Uganda Dairy Biogas Program
GS-3726 ↗ · current registry ID: GS11682
#72of 268 in Biogas#39of 163 in Uganda#648of 1801 in Gold Standard (GS)
Audit Analysis
The Uganda Dairy Biogas Program is a Gold Standard biogas heat-displacement project with VVB-confirmed additionality and no reported reversals, but it carries moderate risk from a project-specific baseline, a 0% leakage deduction with inconsistent justifications across documents, and six corrective actions raised during verification. Transparency is limited by the absence of a verified ERR figure and reliance on annual surveys for usage monitoring. Overall, the project is functional but shows several documentation and methodological gaps that warrant caution.
Red Flags
- Six corrective actions (CAR 01–06) and three compliance log entries were raised in the verification report, indicating multiple unresolved issues at the time of verification
- Leakage justification is inconsistent: the verification report (Sep 2025) characterises it as 'quantified' while the monitoring report (Aug 2025) calls it 'deemed negligible', yet the deduction is 0% in both cases
- Total ERR verified is not stated in any available document, leaving the claimed 6,531 tCO₂e for the six-month monitoring period unconfirmed by an independent figure
- Baseline is project-specific rather than jurisdictional, and no baseline reassessment date is recorded in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2024 | 5,290 | 0 | 5,290 | |
| 2025 | 1,241 | 0 | 1,241 | |
| Total | 6,531 | 0 | 6,531 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversals
0% deduction, inconsistent justification
Project-specific, no reassessment date
FPIC, grievance, benefit sharing documented
CCP and CORSIA status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →