Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

Up Energy Improved Cookstoves Programme, Uganda – CPA No 017

GS-2904 ↗ · current registry ID: GS10915

#328of 1329 in Industrial#30of 163 in Uganda#538of 1801 in Gold Standard (GS)

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
6.0
Documentation
4.5

Audit Analysis

The Up Energy Improved Cookstoves Programme in Uganda is a VVB-verified project with a confirmed combined additionality test, a quantified 5% leakage deduction, and no reported reversal events. However, the project-specific baseline, absence of a stated buffer pool, a major FNRB discrepancy between reporting periods (0.39 vs 0.82), and an extensive list of material findings and corrective actions (over 30 items) significantly undermine confidence in data quality and long-term integrity. The project delivered roughly 336% of its pro-rata ex-ante expectation for the elapsed monitoring period, indicating conservative ex-ante estimates but also raising calibration questions.

Red Flags

  • FNRB value changed from 0.82 (local field method, 2025 verification) to 0.39 (national default, 2026 verification) — a factor-of-2.1 shift that materially alters the emissions reduction calculation and suggests methodological inconsistency between periods
  • Over 30 material findings and corrective actions across verification and monitoring reports, including circular references in ex-ante ER values, inconsistent parameter values, missing methodology citations, and a crediting period discrepancy (15 years in VPA-DD vs 5 years in MR)
  • FPIC status is contradictory: the 2023 verification report records it as not conducted, while the 2025 validation report records it as conducted — the later document is privileged but the inconsistency weakens safeguards confidence
  • Crediting period discrepancy: the VPA-DD references a 15-year period while the monitoring report states 5 years (2024–2029), flagged as a corrective action in the 2026 verification report

Credit Vintages

IssuedRetiredAvailable
2020
27,44613,72313,723
2021
32,72318,11814,605
2022
32,80016,20516,595
2023
31,92431,287637
2024
28,485028,485
Total153,37879,33374,045

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

no reversals

Leakage

5% quantified deduction

Baseline

Project-specific; reassessed 2021

Safeguards

Grievance present; FPIC contradictory

Double-claim

CCP eligible; CORSIA not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-06General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents