Skip to main content
GSEnergy Efficiency - DomesticUgandaAMS-II.G

BioLite Improved Cook stoves Programme - CPA 019 supported by Republic of Korea

GS-3221 ↗ · current registry ID: GS11232

#133of 202 in Industrial#16of 23 in Uganda#321of 426 in Gold Standard (GS)#33of 46 in AMS-II.G

4.7/ 10
Integrity
4.5
Transparency
5.5
Claim Safety
5.0
Documentation
3.5

Audit Analysis

The BioLite Improved Cook Stoves Programme in Uganda is a Gold Standard energy-efficiency project with a confirmed additionality test and quantified 5% leakage deduction, but it is significantly undermined by an extensive list of material findings (8 CARs, 3 CLs), numerous inter-document inconsistencies, and unresolved data contradictions—particularly in the fuel net radiative forcing value and the crediting period length. The project delivered only about 60% of its pro-rata expected emissions reductions for the 2023 monitoring year, and CORSIA eligibility introduces dual-channel risk.

Red Flags

  • Fuel net radiative forcing value differs by a factor of ~97 between the verification report (0.807) and the PDD (78.75), with no unit clarification—this is a critical data-reliability issue
  • Crediting period stated as 5 years (2019–2024) in the verification report but 20 years (2018–2038) in the validation report, creating ambiguity about the true project lifetime
  • 17 corrective actions and 8 CARs were required, including missing end-user databases, sales records, photos, and training records—core MRV evidence was initially absent
  • Reversal events are explicitly 'not addressed' and no buffer pool percentage is stated, leaving permanence risk unquantified
  • CORSIA eligibility is confirmed while CCP status is not stated, creating potential dual-channel crediting risk

Credit Vintages

IssuedRetiredAvailable
2021
21,90621,9060
2022
23,5947,01616,578
2023
22,746022,746
2024
19,783019,783
Total88,02928,92259,107

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Reversal not addressed, no buffer pool

Leakage

5% quantified deduction

Baseline

Project-specific, measured, reassessed 2024

Safeguards

FPIC and grievance present, but gaps noted

Double-claim

CORSIA-eligible, CCP status unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS II G: Energy efficiency measures in thermal applications of non-renewable biomass

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents