CPA 051 – Charcoal Stoves in Kenya
GS-3184 ↗ · current registry ID: GS11196
#8of 202 in Industrial#2of 42 in Kenya#40of 426 in Gold Standard (GS)#2of 46 in AMS-II.G
Audit Analysis
The BioLite Improved Cook Stoves programme in Kenya is a well-structured energy-efficiency project with VVB-confirmed additionality, a quantified 5% leakage deduction, and a conservative national-default FNRB. However, the absence of a buffer pool, a project-specific baseline (contradicting the PDD's jurisdictional reference), and a long trail of corrective actions and documentation gaps temper confidence. The project delivered roughly 478% of the pro-rata PDD expectation for the elapsed monitoring period, indicating conservative ex-ante estimates.
Red Flags
- No buffer pool percentage is stated in any available document, leaving permanence risk unmitigated despite the project's 15-year crediting period.
- Baseline method is recorded as 'project-specific' in the 2025 verification report but 'jurisdictional' in the 2021 PDD — a material discrepancy that weakens baseline robustness.
- Multiple open and recently closed corrective actions (up to 8 CARs in one cycle) and a finding that SDG 1 monitoring was not conducted in the latest period indicate ongoing MRV compliance gaps.
- CORSIA eligibility and CCP status are not stated in any extracted document, leaving dual-channel risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 31,306 | 14,047 | 17,259 | |
| 2022 | 29,680 | 22,133 | 7,547 | |
| 2023 | 24,475 | 0 | 24,475 | |
| Total | 85,461 | 36,180 | 49,281 |
Risk Indicators
Combined test, VVB-confirmed
No buffer pool; no reversals reported
5% quantified deduction
Project-specific; PDD discrepancy
FPIC, grievance mechanism, SDGs
CORSIA/CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →