Up Energy Improved Cookstoves Programme, Uganda – CPA No 003
GS-2891 ↗ · current registry ID: GS10901
#739of 1329 in Industrial#91of 163 in Uganda#1110of 1801 in Gold Standard (GS)#121of 189 in AMS-II.G
Audit Analysis
The Up Energy Improved Cookstoves Programme in Uganda is a Gold Standard energy-efficiency project with a quantified 5% leakage deduction and a conservative national-default fNRB, but it is undermined by a verified ERR that exceeds the lifetime ex-ante estimate by roughly 78%, contradictory additionality-verification and FPIC records across documents, and a long trail of clerical and data-consistency findings across multiple verification cycles. The project's safeguards and monitoring framework are present but inconsistently documented, and the absence of stated CORSIA/CCP status leaves dual-channel risk unaddressed.
Red Flags
- Verified ERR of 200,769 tCO2e for the 2024-07 to 2024-12 monitoring period is approximately 22× the pro-rata expectation derived from the 113,098 tCO2e lifetime ex-ante estimate (expected ≈ 9,048 tCO2e for 6 months of a 6.25-year crediting period), raising a serious over-crediting concern.
- Additionality verification status is contradictory: the January 2025 verification report records it as not confirmed by the VVB, while the February 2025 validation report records it as confirmed; the more recent validation report is privileged but the discrepancy weakens confidence.
- FPIC status is contradictory: the January 2024 verification report states FPIC was not conducted, while the February 2025 validation report states it was conducted; the more recent record is privileged but the inconsistency is a safeguards concern.
- ERR figures changed between the January 2025 verification report (224,672 tCO2e) and the August 2025 verification report (200,769 tCO2e) without a clear explanation in the extracted record, indicating data-reliability issues.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 38,342 | 30,129 | 8,213 | |
| 2022 | 25,647 | 25,135 | 512 | |
| 2023 | 26,781 | 6,021 | 20,760 | |
| 2024 | 14,880 | 7,241 | 7,639 | |
| Total | 105,650 | 68,526 | 37,124 |
Risk Indicators
Test present but VVB verification status contradictory
no reversal events but attrition risk unquantified
5% quantified deduction applied
Project-specific baseline, reassessed 2024
Grievance mechanism and benefit sharing present; FPIC status contradictory
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →