Skip to main content
GSEnergy Efficiency - DomesticUgandaAMS-II.G

BioLite Improved Cook stoves Programme - CPA 020 supported by Republic of Korea

GS-3222 ↗ · current registry ID: GS11233

#77of 202 in Industrial#9of 23 in Uganda#203of 426 in Gold Standard (GS)#18of 46 in AMS-II.G

5.2/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
6.0
Documentation
4.5

Audit Analysis

The BioLite Improved Cook Stoves Programme in Uganda is a Gold Standard energy-efficiency project with VVB-confirmed additionality and a quantified 5% leakage deduction, but it is undermined by a project-specific baseline, the absence of a stated buffer pool, and an unusually large number of material findings and corrective actions (17) spanning inconsistencies in emission values, missing documentary evidence, and template non-compliance. The project delivered roughly 60% of its pro-rata expected reductions for the 2023 monitoring period, suggesting conservative crediting but also raising questions about the robustness of the underlying activity data.

Red Flags

  • 17 corrective actions required across the verification cycle, including missing end-user databases, photos, training records, and sales data — core evidence for an energy-efficiency project
  • Contradiction in total ERR: the PDD states 1,498,873 tCO2e while the issuance document states 2,649,011 tCO2e (both dated 2024-11-18), a 77% gap that is unexplained
  • Crediting period discrepancy: the verification report shows a 5-year window (2019–2024) while the validation report shows a 20-year window (2018–2038), creating ambiguity about the true project duration
  • No buffer pool percentage stated in any available document, leaving permanence risk unquantified
  • FNRB value contradiction: 0.807 in the verification report versus 78.75 in the PDD — likely a unit/fraction mismatch but unexplained in the record

Credit Vintages

IssuedRetiredAvailable
2021
7987980
2022
2,7162,66254
2023
2,80702,807
2024
2,44002,440
Total8,7613,4605,301

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; reversal risk unquantified

Leakage

5% quantified deduction

Baseline

Project-specific, measured, reassessed 2024

Safeguards

FPIC and grievance present but material findings on safeguar

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS II G: Energy efficiency measures in thermal applications of non-renewable biomass

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents