Skip to main content
GSEnergy Efficiency - DomesticMalawiAMS-II.G

GS11677 GS11902 Malawi Biomass Energy Conservation Programme CPA 10

GS-3924 ↗ · current registry ID: GS11910

#9of 1329 in Industrial#1of 92 in Malawi#38of 1801 in Gold Standard (GS)#3of 189 in AMS-II.G

6.6/ 10
Integrity
6.5
Transparency
7.0
Claim Safety
6.5
Documentation
6.5

Audit Analysis

A Gold Standard cookstove project in Malawi with VVB-confirmed additionality, a quantified 5% leakage deduction, and verified emissions reductions closely matching claims (99.6% delivery). However, the absence of a buffer pool, a project-specific baseline without a stated reassessment date, and multiple administrative corrective actions temper the overall quality. The project is operationally sound but carries moderate structural risks around permanence and baseline robustness.

Red Flags

  • Baseline last reassessed date not found in any document; project-specific baseline method without documented reassessment cadence
  • Six contradictions across documents (leakage treatment, ERR figures, usage rate, additionality test type, monitoring method, crediting period) indicate inconsistent record-keeping
  • CORSIA eligibility and CCP status both not stated, leaving dual-channel risk unaddressed

Credit Vintages

IssuedRetiredAvailable
2021
40,64940,063586
2022
12,597012,597
Total53,24640,06313,183

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

stove abandonment risk unaddressed

Leakage

5% quantified deduction

Baseline

Project-specific; reassessment date not stated

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AMS-II.G

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents