Skip to main content
GSEnergy Efficiency - DomesticUgandaGeneral Methodologyv2.1

Impact Carbon and myclimate Safe Water and Improved Cookstoves Global PoA - Uganda VPA

GS-314 ↗ · current registry ID: GS2296

#918of 1329 in Industrial#113of 163 in Uganda#1339of 1801 in Gold Standard (GS)

4.5/ 10
Integrity
4.2
Transparency
5.0
Claim Safety
4.8
Documentation
4.2

Audit Analysis

This Gold Standard energy-efficiency project (improved cookstoves and water purifiers in Uganda) has been operating since 2013 and is in its second crediting period. The latest verification report (July 2026) confirms cumulative emissions reductions of 843,008 tCO₂e, but the verification process surfaced over 30 material findings and corrective actions, numerous parameter contradictions across documents, and a low extraction confidence rating. The project's avoidance-type design limits permanence risk, but the volume of data inconsistencies and the shift from a 5% to a 0% leakage deduction warrant caution.

Red Flags

  • Over 30 material findings and 30+ corrective actions identified in the 2026 verification report, including discrepancies between the monitoring report and sales database, inconsistent ex-ante ER calculations, and missing survey data
  • Leakage deduction reduced from 5% (PDD, 2014) to 0% (2026 verification) with only a 'deemed negligible' justification, while the 2025 verification had described leakage as 'quantified'
  • Additionality verification status contradicts between the February 2025 verification report (confirmed) and the October 2025 validation report (not confirmed)
  • Safeguards documentation is inconsistent: the most recent verification (2026) does not mention safeguards, while the 2025 verification did
  • Low extraction confidence across the document set, indicating at least one key document was poorly readable or incomplete

Credit Vintages

IssuedRetiredAvailable
2013
1241240
2014
2,0122,0120
2015
26,32925,872457
2016
55,55455,5540
2017
54,28954,2890
2018
51,31251,3120
2019
154,749134,93219,817
2020
192,543149,75842,785
2021
218,374131,72386,651
2022
558,502375,242183,260
2023
626,468513,063113,405
2024
449,106118,164330,942
Total2,389,3621,612,045777,317

Risk Indicators

Additionality

Barrier test confirmed but contradicted in later validation

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction with thin justification; was 5% in PDD

Baseline

Project-specific baseline, reassessed 2020

Safeguards

FPIC and grievance mechanism present, but safeguards not mentioned in latest report

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-05General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents