Up Energy Improved Cookstoves Programme, Uganda – CPA No 040 supported by Republic of Korea
GS-3763 ↗ · current registry ID: GS11529
#808of 1329 in Industrial#102of 163 in Uganda#1204of 1801 in Gold Standard (GS)#130of 189 in AMS-II.G
Audit Analysis
The Up Energy Improved Cookstoves project in Uganda has a solid additionality foundation (combined test, VVB-verified) and a quantified 5% leakage deduction, but is undermined by a project-specific baseline, absence of a stated buffer pool, and a 26-fold discrepancy between the ex-ante lifetime ERR (≈113,098 tCO₂e) and the 2022 verified ERR (600,815 tCO₂e) drawn from a prior crediting period. Multiple corrective actions and material findings, together with unresolved CORSIA/CCP status, limit confidence in the credit's robustness.
Red Flags
- The 2022 verification report records a verified ERR of 600,815 tCO₂e for a single monitoring year, while the 2024 appendix states a lifetime ex-ante estimate of only ≈113,098 tCO₂e for the current 5-year crediting period — a 26× gap that, although attributable to different crediting periods, signals a major parameter shift or possible data error that is not explained in the available documents.
- CAR #2 explicitly flags a need to cross-check ICS databases to avoid double counting with an existing project, indicating a residual double-claiming risk that has not been fully resolved.
- CORSIA eligibility and CCP status are both not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2021 | 26,307 | 26,307 | 0 | |
| Total | 26,307 | 26,307 | 0 |
Risk Indicators
Combined test, VVB-verified
no reversal data
5% quantified deduction
Project-specific; reassessed 2024
FPIC, grievance, safeguards documented
CORSIA & CCP status not stated; CAR #2 flags ICS cross-check
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →