Skip to main content
VCSAgriculture Forestry and Other Land UseUganda Registry: RegisteredAR-ACM0003

Kijani Forestry smallholder farmer forestry project

VCS-4475 ↗

#164of 261 in Soil carbon#130of 163 in Uganda#1071of 1339 in Verra (VCS)#67of 97 in AR-ACM0003

4.3/ 10
Integrity
3.8
Transparency
5.0
Claim Safety
4.2
Documentation
4.5

Audit Analysis

The Kijani Forestry project in Uganda is a smallholder tree-planting initiative with VVB-verified additionality and a 14% buffer pool, but the verification report surfaced 27 material findings and 26 corrective actions, including insufficient justification for zero leakage, a project-specific baseline, and a potential double-counting risk under Uganda's NDCs. The claimed and verified ERR figures match at 850 tCO₂e for the first monitoring period, though the PDD's ex-ante figure of 1,430 tCO₂e introduces uncertainty about the baseline estimate. Overall, the project's integrity is undermined by the volume of unresolved methodological concerns and the lack of a robust leakage or permanence risk assessment.

Red Flags

  • 27 material findings and 26 corrective actions raised by the VVB, including incorrect application of CDM Tool 02, insufficient common-practice analysis, and missing ex-ante buffer contribution calculations
  • Zero leakage deduction justified only as 'deemed negligible,' yet the verification report itself flags 'insufficient justification for zero leakage' as a material finding
  • Material finding raises potential double counting of reforestation activities under Uganda's NDCs, with no documented resolution
  • Reversal events are marked as 'not addressed' in the extracted record, and the non-permanence risk report required updates to justify risk ratings
  • Five contradictions across documents on ERR figures, buffer pool percentage, leakage treatment, and crediting period dates

Credit Vintages

IssuedRetiredAvailable
2022
202
Total202

Risk Indicators

Additionality

VVB-verified but with material findings on common-practice analysis and CDM Tool 02 application

Permanence

14% buffer pool present; reversal events not addressed; NPR required updates

Leakage

0% deduction with 'deemed negligible' justification flagged as insufficient by the VVB

Baseline

Project-specific baseline; zero-emission justification found insufficient; reassessment timing not stated

Safeguards

FPIC and grievance mechanism documented, but AFOLU safeguards and stakeholder feedback flagged as insufficient

Double-claim

CORSIA and CCP status not stated; NDC double-counting risk raised as material finding

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents