Vai al contenuto principale
VCS Agriculture Forestry and Other Land Use Uganda Registry: Registered Documentazione completa General Methodology v2.0

Kijani Forestry smallholder farmer forestry project

VCS-4475 ↗

4.4 / 10
Integrity
4.3
Transparency
4.5
Claim Safety
3.8
Documentation
5.2

Score Breakdown

Integrity

verified additionality confirmed by the VVB (verification report, 2025-09-18) and barrier test applied

missing leakage not credibly addressed (verification report states 'not addressed' and earlier doc inconsistently labels leakage 'deemed negligible')

Transparency

verified VVB named (Earthood Services Private Limited) and monitoring period provided (monitoring report 2022-08-22 — 2023-08-28)

missing many core MRV parameters missing or not found in extracted records (no verified or claimed ERR, grid emission factor, buffer pool percentage)

Claim Safety

missing baseline is project-specific (AR-ACM0003/project methodology) with no evidence of recent reassessment

inferred contradiction on leakage justification and missing info on CORSIA/CCP status increases over-crediting risk

Documentation

verified recent verification and issuance documents exist (verification report and issuance doc dated 2025-09-18)

missing extraction confidence is only medium and several fields are null or not stated; monitoring report (2024-10-28) contradicts verification on several safeguards-related items

Detailed Analysis

Integrity

Additionality was confirmed by the independent VVB in the verification report (2025-09-18) using a barrier test, which supports basic additionality. However the project uses a project-level baseline under AR-ACM0003 (methodology v2.0) with no evidence that the baseline was recently reassessed (baseline reassessment not found in available documents). Leakage treatment is either not addressed or inconsistently documented (verification report states 'not_addressed'; an earlier verification entry dated 2025-08-06 notes 'deemed negligible'), and buffer pool percentage and reversal handling are not provided. These gaps and inconsistencies reduce confidence in permanence and leakage controls.

Transparency

The verification and issuance documents are available and name the VVB (Earthood Services Private Limited) and provide a monitoring period (2022-08-22 — 2023-08-28), which supports traceability. Nevertheless many key MRV numbers are missing from the extracted record (no total ERR claimed/verified, no grid emission factor, no buffer percentage, usage monitoring not stated). The minimum extraction confidence is medium, further lowering transparency.

Claim Safety

Claim risk is elevated because the baseline is project-specific and not shown to have been reassessed, increasing over-crediting risk. Leakage justification is unclear or contradictory across documents, and usage or emission factors are not provided, preventing independent checks on claimed reductions. CORSIA and CCP status are not stated, so double-claim risk cannot be ruled out.

Documentation

There are multiple evidence documents (verification report, monitoring report, issuance, stakeholder consultation) and a recent issuance date (2025-09-18), which is positive. However extraction confidence is medium and the monitoring report (2024-10-28) contradicts the later verification/issuance report on safeguards, FPIC, benefit sharing and grievance mechanism; those contradictions reduce documentation reliability. No corrective actions or material findings are recorded in the extracted data.

Overall

Overall score reflects a mix of verified elements (VVB confirmation of additionality, recent verification/issuance) and material gaps/contradictions (leakage not credibly addressed, missing MRV parameters, contradictory statements on safeguards and FPIC between monitoring report 2024-10-28 and verification/issuance 2025-09-18). Specifically, contradictions show the monitoring report did not document safeguards, FPIC, benefit sharing or grievance mechanism while the later verification/issuance asserts they exist; I privileged the verification/issuance (more recent, higher-priority verification document) for scoring but penalized scores for the existence of contradictions because they indicate reliability issues in the documentary record. The leakage field is contradictory within verification documents (one entry 'deemed negligible' on 2025-08-06 vs 'not_addressed' in the verification report 2025-09-18) — I treated this as an evidence reliability problem and downgraded leakage/permanence-related assessment accordingly.

Audit Analysis

The project shows some positive elements — additionality confirmed by an independent VVB and recent verification/issuance documents — but several core integrity risks remain: project-specific baseline not reassessed, leakage and reversals are not credibly addressed, and key emission parameters are missing. Contradictions between the 2024 monitoring report and 2025 verification/issuance documents reduce confidence.

Project Description

Proponent: Multiple Proponents Protocol categories: Agriculture Forestry and Other Land Use Protocols: AR-ACM0003 Estimated annual GHG reductions: 316293 tCO2e Region: Africa Registration date: 2025-09-18

Red Flags

  • Leakage treatment not addressed or inconsistent across documents
  • Contradictory statements on safeguards, FPIC and grievance mechanism between monitoring and verification reports

Credit Vintages

Issued Retired Available
2022
2 0 2
Total 2 0 2

Cosa migliorerebbe questo punteggio

  • Provide explicit, documented leakage assessment and any leakage deductions or justification in monitoring/verification documents.
  • Resolve contradictions by publishing consistent safeguards documentation (FPIC, benefit sharing, grievance mechanism) in the monitoring report and include baseline reassessment evidence or justification.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed

Permanence

reversal not addressed

Leakage

not credibly addressed

Baseline

project-specific baseline

Safeguards

inconsistently documented

Double-claim

CORSIA/CCP status unknown

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-23 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti