Buffer pool: the methodology sets rules for it in some cases. CarbonMeld reads it in the project's documents. It does not apply to CDM projects. Our current method never counts it as a gap for them. At the listing stage (under development), Verra asks a draft project description without its non-permanence risk section (Verra, «Registration and Issuance Process» v4.6, 16 Oct 2024, §3.1.3, p7). CarbonMeld then adds no buffer flag. CM-F-ARR-BUFFER
AR-ACM0003 — Afforestation and reforestation of lands except wetlands
About this methodology
Projects establish or restore forests on land outside wetlands. The method measures net CO2 removal through changes in vegetation and other included carbon stocks.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 2.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- CO2 removals
- Activity
- Forestry
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (246 projects)
- CerCarbono (CC) (19 projects)
- BioCarbon Registry (BCR) (3 projects)
3 more
- Global Carbon Registry (GCR) (2 projects)
- International Carbon Registry (ICR) (2 projects)
- Oncra (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Leakage not addressed (forest and land) Q-LEAKAGE-NOT-ADDRESSED
Forest, wetland, peat, grassland and soil carbon: the documents read do not address leakage. Outside REDD+ and reforestation, the rule applies only where the methodology requires a leakage assessment. At the listing stage, the rule does not apply if the programme's listing form has no section on leakage. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Where carbon is stored: the permanence start P-START
CarbonMeld scores permanence only for projects that store carbon. Forest projects start from CCQI's grade of the programme on criterion 3.2. CCQI grades this criterion by programme, so its grade applies to every methodology of the programme. Where CCQI does not grade the programme, permanence starts at the neutral 5.0: the CDM's grade does not stand in for another programme's approach to permanence. Direct air capture with storage, biogenic emissions capture with storage, other geological storage and biochar start at the top, 8.0. The EU classes these types as permanent carbon removals. Enhanced weathering also starts at 8.0. It shares a family with direct air capture. This start is our own judgement. Concrete carbonation, ocean alkalinity, buried biomass and long-lived materials start at the neutral 5.0. These types have no class in a public source.
Forests: CCQI's grade of the programme.
Set by the methodology or the programme, not assessed by our current method
- not assessed
No legal requirement for the activity: the methodology sets rules for it in some cases (VM0047 §7, p. 13). Our current method does not assess it. CM-F-ARR-REGULATORY-SURPLUS
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology (GS LUF v1.2.1, p. 14). Our current method does not assess it. CM-F-ARR-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-GRID-EFGrid emission factor
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-FEEDSTOCK-SUSTAINABILITYSustainability of the feedstock
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
Transition to VM0047
This methodology is based on the following methodology: AR-ACM0003 A/R Large-scale Consolidated Methodology: Afforestation and Reforestation of Lands Except Wetlands
source ·
Dates and conditions (1)
- New VCS projects that had not requested listing as under validation by 28 December 2023 must use VM0047; projects already in validation with AR-ACM0003 or AR-AMS0007 had to complete it by 30 June 2025. source ·
Replaces AR-ACM0001 · AR-ACM0002 · AR-AM0002 · AR-AM0004 · AR-AM0005 · AR-AM0007 · AR-AM0009 · AR-AM0010 · AR-AM0011 · AR-AM0012 · AR-AM0013
source: AR-ACM0001 · AR-ACM0002 · AR-AM0002 · AR-AM0004 · AR-AM0005 · AR-AM0007 · AR-AM0009 · AR-AM0010 · AR-AM0011 · AR-AM0012 · AR-AM0013
Top projects using AR-ACM0003
This page ranks projects using AR-ACM0003 by their CarbonMeld document-based ratings. The rank compares project ratings; it is not a rating of the methodology itself.
32 rated projects of the 286 tracked in this methodology · average rating 4.4/10 · ranked by CarbonMeld's document-based rating: additionality, quantification, permanence (where carbon is stored) and claim safety.
110 analysed project pages, A–Z →
Which registries list projects under AR-ACM0003?
In CarbonMeld's data, AR-ACM0003 projects are on 7 registries: Verra (246), CerCarbono (19) and CDM (13), and 4 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| Verra (VCS) | 246 | 94 | See the list |
| CerCarbono (CC) | 19 | 16 | See the list |
| CDM (UNFCCC) | 13 | 6 | See the list |
| BioCarbon Registry (BCR) | 3 | 0 | See the list |
| Global Carbon Registry (GCR) | 2 | 0 | See the list |
| International Carbon Registry (ICR) | 2 | 2 | See the list |
| Oncra | 1 | 1 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis, so they can be larger than the ranking below. «Registered» counts the records whose current registry status is «registered», as last read (26 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- 4 5.3
- 5 5.1
- 6 5.1
- 7 5
- 8 5
- 9 5
- 10 4.7
- 11 4.7
- 12 4.7
- 13 4.7
- 14 4.7
- 15 4.2
- 16 4.2
- 17 4
- 18 3.8
- 19 3.8
- 20 3.8
- 21 3.8
- 22 3.8
- 23 3.8
- 24 3.8
- 25 3.8
- 26 3.8
- 27 3.8
- 28 3.8
- 29 3.8
- 30 3.8
- 31 3.8
- 32 3.6
