Reforestation Of Degraded Forest Reserve Areas In Ghana, West Africa
Score Breakdown
Integrity
verified additionality confirmed by the VVB (KBS Certification Services) in the monitoring report (2024-04-12)
missing contradictions on buffer pool (10% vs 18%), leakage deduction (10% vs 0%) and reversal reporting introduce reliability concerns
Transparency
verified monitoring period provided (2020-11-02 — 2022-09-19) and VVB named in the monitoring report (2024-04-12)
missing total emissions reductions claimed/verified and FNRB/grid EF not found in available extracted records
Claim Safety
missing project is CORSIA-eligible (double-claim risk) as stated in the monitoring record (2024-04-12)
inferred leakage quantified with a 10% deduction in the latest report, but earlier documents showed 0% or 'negligible', creating over‑crediting uncertainty
Documentation
verified 20 documents were used and the monitoring report is recent (2024-04-12)
inferred minimum extraction confidence is 'medium' and evidence documents list is 'unknown', indicating gaps in accessible source detail
Detailed Analysis
Integrity
Additionality is confirmed by the independent verifier (KBS Certification Services) and a combined additionality test is reported in the monitoring report (2024-04-12), which supports baseline/additionality robustness. The project uses a project-specific baseline methodology (AR-ACM0003, Version 02.0) and reports a buffer pool; however, there are direct contradictions across documents on buffer pool percentage (10% vs 18%), leakage treatment (quantified with a 10% deduction vs deemed negligible/0%), and whether reversal events are addressed. Material findings (5 CARs and 4 CLs and four FARs) were raised and closed according to the monitoring report, which mitigates some concerns but the contradictions reduce confidence in the integrity of reported parameters.
Transparency
The monitoring report names the VVB and provides a clear monitoring period (2020-11-02 to 2022-09-19) and the project registry (VCS). However, essential MRV outputs such as total emissions removals claimed and verified, FNRB value, and grid emission factor are not present in the extracted record, limiting verifiability. The minimum extraction confidence is medium, which further reduces trust in the completeness of the extracted public evidence.
Claim Safety
CORSIA eligibility is stated in the monitoring record, creating a potential double-claim risk unless retirements and registry rules are tightly controlled. The lack of FNRB and usage-rate data and the conflicting leakage deductions (10% vs 0%) increase the risk of over-crediting. While leakage is described as 'quantified' in the latest report, earlier documents reported it as negligible, which undermines confidence in consistency of claims.
Documentation
Twenty documents were used and the most recent monitoring report is dated 2024-04-12, which is positive for recency. Nonetheless, the extracted evidence list is 'unknown', several key numerical fields are not found in the extraction (total reductions claimed/verified, FNRB, grid EF), and extraction confidence is only medium. There were corrective requests and findings recorded (CARs/FARs) but they were reportedly closed; no outstanding corrective actions are listed.
Overall
I privileged values reported in the most recent monitoring report (2024-04-12) for contradictory items because it is the latest available verification/monitoring evidence and lists the VVB (KBS Certification Services). Specifically: buffer pool percentage — privileged 10% from the 2024 monitoring report over 18% from 2020 (more recent and includes verifier oversight); leakage treatment — privileged 'quantified' and a 10% leakage deduction from 2024 over earlier 'deemed negligible' or 0% (latest monitoring claims quantified leakage and a deduction); reversal events — privileged 'reported' from 2024 over 'not addressed' from 2024-04-04 because the later monitoring report explicitly describes monitoring and thresholds for fires and reversal quantification. The contradictions and missing MRV numbers reduce confidence and pull overall quality down despite verifier confirmation of additionality. Documentation and medium extraction confidence mean some transparency caps may apply in downstream gating.
Audit Analysis
The project shows several positive integrity signals (VVB confirmation of additionality, quantified leakage and a buffer pool) but also material contradictions across documents and missing MRV figures. Documentation is adequate in volume but has gaps (key emission/ERR numbers and some methods not extracted) and a medium extraction confidence. CORSIA eligibility and missing FNRB/usage details raise claim-safety concerns.
Project Description
Miro Forestry, a UK-based forest investment company, is undertaking a reforestation project in Ghana, West Africa. The project aims to restore 14,000 hectares of degraded forest reserves by 2025. This will help to combat deforestation, improve soil quality, protect water resources, and enhance biodiversity in the region. The company has secured land leases and benefit-sharing agreements with local landowners and the Forestry Commission of Ghana, ensuring that the project benefits local communities through employment opportunities and social engagement programs. Miro Forestry adheres to high environmental and social standards, aiming to achieve international forestry certification. The project is expected to remove a substantial amount of CO2e over its 30-year lifespan, contributing to climate change mitigation efforts.
Red Flags
- Contradictory buffer pool percentage (10% vs 18%) across documents
- Contradictory leakage treatment (quantified with 10% deduction vs deemed negligible / 0%)
- Reversal events are reported in one document but listed as not addressed in another
- Key MRV numbers (total emissions reductions claimed/verified, FNRB value, grid EF) not found
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2017 | 17,109 | 17,109 | 0 | |
| 2018 | 29,102 | 29,102 | 0 | |
| 2019 | 101,208 | 101,208 | 0 | |
| 2020 | 55,442 | 52,171 | 3,271 | |
| 2021 | 117,526 | 117,491 | 35 | |
| 2022 | 84,361 | 82,076 | 2,285 | |
| Total | 404,748 | 399,157 | 5,591 |
Cosa migliorerebbe questo punteggio
- Publish or extract the MRV outputs (total removals claimed and verified, FNRB value, grid emission factor) in the evidence package.
- Resolve and document the contradictory values (buffer pool %, leakage deduction %) with an explicit reconciliation note and reference to the authoritative document/version.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed
buffer present but reversals reported
quantified but inconsistent across docs
project-specific baseline
FPIC and grievance present
CORSIA-eligible
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
issuance
Other
validation
- VCS-Validation-Representation-MIRO Ghana-SP.pdf
- 211214_VCS-Joint-Validation-Verification-Rerport- MIRO Ghana-SP_clean.pdf
- VCS-Verification-Representation-v4.1_Reforestation of degraded forest reserve areas in Ghana_signed_24072023.pdf
- 2410_FVR_Miro Ghana_Clean_18 04 2024.pdf
- VCS-Verification-Representation-MIRO Ghana-SP.pdf
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →