Skip to main content
VCSAgriculture Forestry and Other Land UseMexico Registry: RegisteredAR-ACM0003

Fresh Breeze Afforestation Project

VCS-1141 ↗

#78of 261 in Soil carbon#13of 47 in Mexico#651of 1339 in Verra (VCS)#30of 97 in AR-ACM0003

5.1/ 10
Integrity
5.5
Transparency
4.8
Claim Safety
4.8
Documentation
5.5

Audit Analysis

The Fresh Breeze Afforestation Project is a long-running VCS ALM project in Mexico with a 53-year crediting period, verified by AENOR CONFÍA. While no reversal events have been reported and a 10% buffer pool is in place, the project carries notable concerns: a 29% discrepancy between the monitoring report and verification report on verified emissions reductions, a shift in leakage treatment from quantified to deemed negligible, and a reduction in the buffer pool from 14% to 10%. The additionality test type is inconsistent across documents (common practice vs. combined), and the project-specific baseline has no documented reassessment despite the 10-year interval having passed in 2019.

Red Flags

  • Verified ERR of 74,333 in the 2025 verification report is 29% higher than the 57,756 reported in the 2025 monitoring report — an unusual upward adjustment by the VVB that undermines confidence in the MRV chain
  • Leakage treatment shifted from a quantified deduction (2021 verification report) to 0% deemed negligible (2025 verification report) without a clear documented rationale for the change
  • Buffer pool reduced from 14% (2021 verification report) to 10% (2025 verification report), weakening the permanence safeguard
  • Additionality test type is inconsistent: the 2025 monitoring report states 'common practice' while the 2021 monitoring report states 'combined' — AR-ACM0003 v1 typically requires a combined test
  • Baseline reassessment was due in 2019 (10-year interval from the 2009 project start) but no reassessment date is found in any available document

Credit Vintages

IssuedRetiredAvailable
2009
245,533241,5363,997
2014
644,011641,3612,650
2020
143,48011,408132,072
2021
31,766031,766
2022
25,990025,990
Total1,090,780894,305196,475

Risk Indicators

Additionality

VVB-confirmed but test type inconsistent (common practice vs combined)

Permanence

Buffer reduced to 10%; no reversals but safeguard weakened

Leakage

0% deduction, deemed negligible; shifted from quantified in 2021

Baseline

Project-specific; 10-year reassessment due 2019 not documented

Safeguards

FPIC conducted, grievance mechanism present, safeguards documented (2025 VR)

Double-claim

CORSIA-eligible; CCP status not mentioned — dual-channel risk unconfirmed

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02AR-ACM0003

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents