CARBONO SANTA INES
#37of 80 in ARR (afforestation)#96of 124 in Colombia#71of 99 in CerCarbono (CC)#62of 97 in AR-ACM0003
Audit Analysis
Carbon Santa Ines is a Colombian afforestation project (AR-ACM0003 v2.0) verified by ICONTEC with a 15% buffer pool, but it carries significant documentation concerns including over 20 material findings (all resolved), contradictory leakage justifications, and a project-specific baseline with no recorded reassessment date. The absence of a lifetime ex-ante estimate prevents a meaningful pro-rata delivery check, and key parameters such as the additionality test type, FNRB value, and safeguards documentation remain unresolved in the extracted record.
Red Flags
- Over 20 material findings in the verification report, including sampling error exceeding the 10% threshold, property-name mismatches against legal certificates, calculation spreadsheet errors, and eligibility analysis including stands without inventory data — all resolved but indicating weak initial documentation quality
- Leakage justification is contradictory: the 2022-12-04 verification report states 'quantified' while the 2022-05-09 report states 'deemed negligible', yet the deduction is 0% in both cases
- Reversal events are listed as 'not addressed' in the most recent verification report (2022-05-09), despite a 15% buffer pool being in place
- No lifetime ex-ante ERR estimate is available in the extracted record, making it impossible to verify whether the 59,872 tCO2e verified over ~3.4 years is consistent with the project's original projections
- Safeguards documentation is contradictory: one verification report (2022-03-29) confirms safeguards are mentioned, while a later one (2022-05-09) states they are not; FPIC and grievance mechanism are not stated in the extracted record
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2018 | 2,446 | 0 | 2,446 | |
| 2019 | 2,662 | 0 | 2,662 | |
| 2020 | 2,670 | 0 | 2,670 | |
| 2021 | 1,203 | 0 | 1,203 | |
| Total | 8,981 | 0 | 8,981 |
Risk Indicators
VVB-confirmed but test type unspecified
15% buffer present; reversal events 'not addressed' in latest report
0% deduction with contradictory justification across reports
Project-specific baseline; no reassessment date recorded
Contradictory documentation; FPIC and grievance mechanism not stated
CORSIA and CCP status not stated; dual-channel risk unassessed
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →