Skip to main content
CCLand use (AFOLU), Land use (AFOLU)ColombiaGeneral Methodologyv2.1

SKCARBONO

ECO-46 ↗

#33of 80 in ARR (afforestation)#85of 124 in Colombia#63of 99 in CerCarbono (CC)

4.7/ 10
Integrity
4.0
Transparency
5.5
Claim Safety
5.0
Documentation
4.5

Audit Analysis

SKCARBONO is a 20-year Pinus/Eucalyptus reforestation project in Colombia with FSC certification and a 15% buffer pool, but the verification report records 13 findings (7 significant adverse conditions) including overlaps with the Páramo del Duende buffer zone, Ley 2da high-conservation areas, and indigenous resguardos. The project delivered roughly 71% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is conservative, yet the 0% leakage deduction for a timber-harvesting forestry project and multiple unresolved contradictions across documents undermine confidence in the credit's integrity.

Red Flags

  • 13 verification findings (7 SAC, 5 SA, 1 SAF) including overlaps with the Páramo del Duende buffer zone, Ley 2da Zone A, and three indigenous resguardos (Bajo Cáceres, La Paila-Naya, Poblazón)
  • Leakage deduction of 0% justified as 'deemed negligible' for a Pinus/Eucalyptus plantation project that will be commercially harvested, while the PDD originally described leakage as 'quantified'
  • Reversal events are marked as 'not addressed' in the verification report but 'none reported' in the monitoring report — an unresolved contradiction on a key permanence indicator
  • FPIC status and grievance mechanism are not stated in any available document despite documented overlaps with indigenous territories
  • Seven contradictions across the document set (ERR figures, leakage basis, safeguards, reversal events, additionality test type, crediting period) reduce data reliability

Credit Vintages

IssuedRetiredAvailable
2010
000
2011
000
2012
94094
2013
3940394
2014
3900390
2015
3900390
2016
3900390
2017
3900390
2018
3900390
2019
8,35808,358
2020
104,0620104,062
2021
120,7370120,737
2022
37,725037,725
Total273,3200273,320

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

15% buffer but reversal events not formally addressed

Leakage

0% deduction, 'negligible' justification weak for harvestable plantation

Baseline

Project-specific baseline, no reassessment date stated

Safeguards

Contradictory documentation; FPIC and grievance mechanism not stated

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-02General Methodology v2.1

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents