Lanao del Sur Bamboo Reforestation Project
#29of 261 in Soil carbon#5of 19 in Philippines#311of 1339 in Verra (VCS)#12of 97 in AR-ACM0003
Audit Analysis
The Lanao del Sur Bamboo Reforestation Project is a VCS ALM project at the validation stage with a confirmed combined additionality test by TÜV NORD CERT, a 10% buffer pool, and no reported reversal events. However, the project relies on a project-specific baseline, applies a 0% leakage deduction justified only as 'deemed negligible' without quantification, and no monitoring reports are yet available to assess delivery. Three contradictions between the PDD and validation report (FPIC, reversal events, leakage) were resolved in favour of the validation report as the higher-priority document.
Red Flags
- Leakage deduction of 0% with justification limited to 'deemed negligible' — no quantified analysis of displaced logging or land-use change in the surrounding area
- Project-specific baseline (not jurisdictional) with no documented reassessment date; first reassessment not yet due under VCS 10-year rule but baseline robustness is inherently weaker
- No monitoring reports available; all ERR figures (6,301,343) are ex-ante validation estimates with no verified delivery data
- Three contradictions between PDD and validation report on FPIC, reversal events, and leakage treatment indicate internal documentation inconsistencies
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed combined test
10% buffer, no reversals
0% deduction, unquantified
Project-specific, not yet due for reassessment
FPIC, grievance mechanism, safeguards documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →