#1El Tigre REDD+BCRColombiaREDD+Registry: Registered6.2/10#2Proyecto Solar Fotovoltaico Distribuido de la Provincia de Jujuy – Valle SurBCRArgentinaRenewable energyRegistry: Registered6.1/10#3Enür Solar Power Plant Bundle ProjectBCRTürkiyeRenewable energyRegistry: Registered6/10
  1. 4
    Mramorak 1&2 Bundled Biogas Power PlantsBCRSerbiaBiogasRegistry: Registered
    5.5
  2. 5
    CultivO2 Project 1BCRColombiaARR (afforestation)Registry: Registered
    5.4
  3. 6
    Proyecto de mitigación de cambio climático Región CaribeBCRColombiaARR (afforestation)Registry: Registered
    5.4
  4. 75.3
  5. 85.3
  6. 9
    Small-scale renewable energy projects in ChileBCRChileRenewable energyRegistry: Registered
    5.3
  7. 10
    Helios Santa Rosa Solar PV PlantBCRArgentinaRenewable energyRegistry: Registered
    5.2
  8. 11
    Solar parks in the cuyo regionBCRArgentinaRenewable energyRegistry: Registered
    5.2
  9. 12
    Proyecto Solar CASA La Calera San LuisBCRArgentinaIndustrialRegistry: Registered
    4.8
  10. 134.4
  11. 14
    CO2Bio P2-2BCRColombiaREDD+Registry: Registered
    4.3
  12. 15
    Zeus Hydroelectric Power PlantBCRColombiaRenewable energyRegistry: Registered
    4.3
  13. 16
    Mixed planting of native and non-native species in Paraguay-IBCRParaguayARR (afforestation)Registry: Registered
    4.2
  14. 17
    Solar water heating systems - GuanajuatoBCRMexicoIndustrialRegistry: Registered
    4.2
  15. 18
    Evrencik WPPBCRTürkiyeRenewable energyRegistry: Registered
    4.1
  16. 194.1
  17. 20
    Proyecto REDD+ MARENA ICHENA- NAG+MA ENOYE RAFUEBCRColombiaREDD+Registry: Registered
    4.1
  18. 21
    Treatment of non-hazardous organic waste to obtain compostBCRArgentinaIndustrialRegistry: Registered
    4.1
  19. 224
  20. 233.8
  21. 24
    Yungas PV Power Plants Bundle ProjectBCRArgentinaRenewable energyRegistry: Registered
    3.7
  22. 25
    ORINOCO2BCRColombiaARR (afforestation)Registry: Registered
    3.5
  23. 263.1
  24. 27
    Emtre Biogas BrazilBCRBrazilBiogasRegistry: Withdrawn from the registry
    1.4
  25. 28
    Proyecto Forestal Alcaraván OrinoquíaBCRColombiaARR (afforestation)Registry: Rejected by the registry
    1.3
  26. 29
    MY_JASAWIBAWA_00/24BCRMalaysiaSoil carbonRegistry: Rejected by the registry
    0.8
  27. 30
    ASKOC DIYARBAKIR BIOGAS PLANTBCRTürkiyeBiogasRegistry: Rejected by the registry
    0.1
  28. 31
    ATLAS BURDUR ANIMAL MANURE METHANE RECOVERY AND UTILIZATION PLANTBCRTürkiyeOtherRegistry: Rejected by the registry
    0.1
  29. 32
    BEUAS ANIMAL MANURE METHANE RECOVERY AND UTILIZATION PLANTBCRTürkiyeOtherRegistry: Rejected by the registry
    0.1
  30. 330.1
  31. 34
    ECO2 INTERNATIONAL-FUNDO LOS CULENESBCRChileARR (afforestation)Registry: Rejected by the registry
    0.1

Rank is by document-based assessment score only. The registry status shown next to each project is a separate fact: inclusion in this ranking is not a statement of current validity or credit eligibility — projects suspended, withdrawn or terminated by their registry can still appear, with their status labelled. Read the methodology.