Skip to main content

Leaderboards/methodology

Top AMS-III.H projects

22 rated projects in this methodology · average score 4.6/10 · ranked by CarbonMeld integrity, transparency and claim-safety scoring.

#1Chol Charoen Group Wastewater Treatment with Biogas System I (Chacherngsao)VCSThailandBiogas6.4/10▲+0.4#2AVN08-S-02, Methane Recovery and Biogas Utilization Project, Nghe An Province, VietnamCDMVietnamBiogas5.7/10▲+0.9#3Wastewater Treatment With Biogas System In Palm Oil Mill At Sawi, Chumporn,ThailandVCSThailandBiogas5.6/10▼-0.1
  1. 45.5▲+0.2
  2. 55.4▲+0.4
  3. 65.1▲+0.3
  4. 74.9▲+0.3
  5. 84.9▼-0.7
  6. 94.9▼-0.1
  7. 104.8▼-0.6
  8. 114.8▼-1.8
  9. 124.6▼-1.9
  10. 134.4▲+0.4
  11. 144.3▼-0.3
  12. 154.3▼-0.9
  13. 16
    Biogas project, BAJ Unit 6CDMIndonesiaBiogas
    4.3▼-0.1
  14. 174
  15. 183.9▼-0.4
  16. 193.8▼-1.0
  17. 203.3
  18. 21
    Renewable Project at Sangli, MaharashtraUCRPlot No A-6 7 8 & 9 Miraj MIDC Dist- Sangli Tal Miraj State- Maharashtra-416410 IndiaOther
    3
  19. 222.8

Scores reflect registry documentation, monitoring history and marketplace behaviour. Read the methodology.