AMS-III.H — Methane recovery in wastewater treatment

About this methodology

Projects capture biogas during wastewater or sludge treatment and burn it or use it for energy. The method compares greenhouse gas emissions with the treatment that would otherwise occur.

Version
19.0 · source ·
Status
Active at CDM / UNFCCC · source ·
Climate outcome
Emission reductions
Activity
Wastewater
Official page
cdm.unfccc.int ·
Also used by projects of
3 more

How methodology v3 reads projects of this type

What CarbonMeld reads

  • shown

    Grid emission factor: the methodology sets rules for it in some cases (AMS-III.H v19.0 para 5, p. 8). CarbonMeld reads it in the project's documents. CM-F-AMS-III-H-GRID-EF

    Link
  • A confirmed investment analysis A-INVEST

    The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).

Figures set against the methodology's own values

  • Integrity comparison

    The small-scale limit is 60 kt CO2e per year (p. 10). CarbonMeld compares the project's annual estimate with it. CM-F-AMS-III-H-SMALL-SCALE-LIMIT

    small-scale limit: 60 kt CO2e per year

    Link

Deductions that can apply

  • A methane activity the law requires A-LEGAL

    The rule applies to projects that capture or avoid methane. These are landfill gas, manure, wastewater, composting and coal-mine methane. They also include orphan wells, oil and gas leaks, rice, enteric methane and household biogas. The documents state that the law requires the activity. Or the documents state that a law requires the capture of the gas. An activity that the law already requires is not additional. If the documents show that the baseline already deducts the amount that the law requires, CarbonMeld takes no point.

Set by the methodology or the programme, not assessed by our current method

  • not assessed

    Leakage: the methodology sets rules for it in some cases (AMS-III.H v19.0 §5.5, p. 24). Our current method does not assess it. CM-F-AMS-III-H-LEAKAGE

    Link
  • not assessed

    Tracking of the end use: the methodology sets rules for it in some cases (AMS-III.H v19.0 para 6, p. 8). Our current method does not assess it. CM-F-AMS-III-H-END-USE-TRACKING

    Link
  • not assessed

    Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-III-H-SAFEGUARDS-FPIC

    Link

Not applicable to this type — never a gap in our current method

The criterion does not apply to this methodology. Our current method never counts it as a gap.

The general rules apply as well. Read the general rules.

The rules of methodology v2.2, as they were: the archived v2.2 page.

History and transitions

All 19 versions · current v19.0
  • v19.0adopted 14 Jun 2019currentsource

    Include reference to methodological tool “TOOL32: Positive lists of technologies”.

  • v18.0adopted 16 Oct 2015source

    Include non-binding best practice examples.

  • v17.0adopted 28 Nov 2014source

    Standardize the requirements on additionality in the methodology in line with other waste sector methodology such as AMS-III.D. It includes provisions for automatic additionality.

  • v16.0adopted 26 Nov 2010source

    To include additional guidelines pertaining to transport of biogas (e.g. by trucks) and biogas application for transportation; To clarify the conditions under which the measurement campaign can be used for baseline emissions determination.

  • v15.0adopted 30 Jul 2010source

    To clarify the criteria to be satisfied for the baseline lagoon treatments systems under the methodology; To include the monitoring table with the required frequency of measurements and options for collection and recording of data.

  • v14.0adopted 26 Mar 2010source

    To include additional clarification on the monitoring requirements of biogas.

  • v13.0adopted 17 Jul 2009source

    To include additional eligible technologies for upgrading biogas for bottling or feeding to natural gas distribution grid. Include an option to use the calculated net calorific value (NCV) of biogas based on methane content measurement …

  • v12.0adopted 28 May 2009source

    To include additional guidance on use of methane generation potential based on Biochemical Oxygen Demand (BOD5,20).

  • v11.0adopted 25 Mar 2009source

    To clarify the methods for determination of baseline for Greenfield projects; To specify minimum requirements concerning sludge removal interval in the baseline anaerobic lagoon; Further guidance on measuring equipment for biogas pressure …

  • v10.0adopted 26 Sept 2008source

    Additional guidance on baseline determination and project emission calculations; Restructured, provisions related to methane correction factor and related uncertainties were revised.

  • v09.0adopted 14 Mar 2008source

    Expand applicability to include pipeline transport of the recovered and upgraded biogas; Additional guidance on sequential treatment of wastewater in anaerobic lagoons.

  • v08.0adopted 30 Nov 2007source

    Expand applicability to bottling of recovered biogas; Additional guidance on emissions from dissolved methane in the treated wastewater; Guidance on use of IPCC default factors for the degradable organic content of sludge.

  • v07.0adopted 19 Oct 2007source

    Expand the applicability to allow recovered biogas to be used for hydrogen production.

  • v06.0adopted 27 Jul 2007source

  • v05.0adopted 4 May 2007source

    To exclude scope 15 from the methodology

  • v04.0adopted 15 Dec 2006source

  • v03.0adopted 21 Jul 2006source

    Clarify the inclusion of methane emission factor in the equation for baseline calculations.

  • v02.0adopted 10 May 2006source

    The Board at its twenty-fourth meeting noted that Type III project activities might be able to achieve significant emission reductions, without exceeding the direct emissions limits i.e. 15 kilo tonnes CO2e applicable at the time. As an …

  • v01.0adopted 24 Feb 2006source

    Initial adoption.

Projects using AMS-III.H

Browse 431 published projects using AMS-III.H, listed alphabetically. There is no ranking for this methodology yet: it appears here automatically once 5 of its projects not in the pipeline or under validation are rated. Open a project to view its registry details and the analysis available for that project.

Which registries list projects under AMS-III.H?

In CarbonMeld's data, AMS-III.H projects are on 7 registries: CDM (373), Verra (43) and CerCarbono (5), and 4 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.

RegistryProjectsRegisteredProjects list
CDM (UNFCCC)373226See the list
Verra (VCS)4318See the list
CerCarbono (CC)50See the list
Gold Standard (GS)33See the list
Universal Carbon Registry (UCR)32See the list
BioCarbon Registry (BCR)20See the list
ITMO Registry (ITMO)20See the list

Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.

39 of these projects have no number: additionality, quantification or both have no public grade of their type of project that applies to them yet. Their pages give the reason and how many negative facts were found; the analysis is in Premium.

← All leaderboards · Full database