Skip to main content
CDMMethane avoidanceChinaAMS-III.H

Henan Taikang Longyuan Methane Recovery Project in new paper-production line

CDM-8869 ↗

#523of 1084 in China#711of 1459 in CDM (UNFCCC)#14of 55 in AMS-III.H

5.2/ 10
Integrity
6.5
Transparency
4.0
Claim Safety
5.5
Documentation
3.5

Audit Analysis

A CDM methane-capture project in China's paper sector with a solid investment-test additionality assessment confirmed by RINA, but the available record is limited to the 2012 validation report and PDD with no monitoring or verification reports. The project-specific modeled baseline and the complete absence of performance data prevent any verification of the 369,270-tonne lifetime claim, and the low extraction confidence further weakens the evidentiary base.

Red Flags

  • No monitoring reports or verification reports are present in the extracted record despite the crediting period (2013–2022) having fully elapsed, making it impossible to confirm actual emission reductions against the 369,270-tonne claim.
  • Minimum extraction confidence is rated low, indicating at least one key document was poorly readable, which undermines confidence in the completeness of the extracted facts.
  • The baseline is project-specific and modeled rather than jurisdictional or standardised, and no baseline reassessment date is recorded in the available documents.

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Investment test, VVB-confirmed

Permanence

Methane avoidance, no reversal risk

Leakage

0% deemed negligible, justified

Baseline

Project-specific, modeled

Safeguards

Mentioned, FPIC/grievance not stated

Double-claim

CORSIA/CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-31AMS-III.H, AMS-I.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents