Guangxi Laibin Organic Wastewater Biogas Power Generation Comprehensive Utilization Project
#59of 111 in Biogas#149of 204 in China#470of 629 in Verra (VCS)#11of 22 in AMS-III.H
Audit Analysis
A newly registered VCS biogas project (AMS-III.H) with a VVB-confirmed investment additionality test, but the validation process surfaced 15 material findings and 29 corrective actions, indicating a weak initial documentation base. Leakage is set at 0% with no clear justification, no buffer pool is in place, and the baseline is project-specific. The project is too early in its crediting period for any monitoring data to exist, limiting the ability to verify delivery against claims.
Red Flags
- 15 material findings and 29 corrective actions identified during validation, including an incomplete additionality assessment, a missing IRR spreadsheet that was only submitted after correction, and absent regulatory surplus demonstration
- Leakage deduction of 0% with justification recorded as 'not addressed' in the most recent validation report (2024-12-05), contradicting an earlier draft that stated 'deemed negligible'
- No buffer pool percentage stated in any available document, leaving permanence risk unmitigated despite the project being an energy-substitution activity
- Baseline is project-specific with no recorded reassessment date, and the PDD describes it as 'modeled' while the validation report describes it as 'mixed' (measured and modeled)
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed but gaps in financial analysis
No buffer pool; reversal stated N/A
0% deduction, justification not addressed
Project-specific, no reassessment recorded
FPIC, grievance, benefit-sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →