Dongxing Waste Incineration Plant leachate biogas Harmless Treatment and Comprehensive Utilization Project

VCS-3851 ↗

#67of 111 in Biogas#159of 204 in China#492of 629 in Verra (VCS)#12of 22 in AMS-III.H

4.6/ 10
Integrity
4.0
Transparency
5.5
Claim Safety
4.5
Documentation
4.5

Audit Analysis

This VCS biogas project (VCS-3851) in China has a verified investment-test additionality and a measured baseline, but the verification report flagged eight material findings including an incorrect additionality demonstration and methodology scope errors. A significant grid emission factor discrepancy (0.8587 vs 0.57205) between the verification and monitoring reports undermines confidence in the credit quantity, and the leakage justification is inconsistent across documents. The project delivered roughly 93% of its pro-rata ex-ante expectation for the elapsed monitoring period, which is reasonable, but the documentation quality and internal consistency are below standard.

Red Flags

  • Grid emission factor contradicts between the verification report (0.8587) and the monitoring report (0.57205), both dated 2024-06-19, creating uncertainty about the correct credit quantity
  • The verification report lists 'Incorrect additionality demonstration' and 'Incorrect Scope and applicability condition of AMS-III.H' as material findings, indicating fundamental methodology application errors
  • Leakage justification is inconsistent: the verification report states 'quantified' while the monitoring report states 'deemed negligible', both for a 0% deduction
  • Eight material findings were identified during verification, including missing project boundary, missing GHG source identification, and missing monitored parameter TDLj,y
  • Minimum extraction confidence across the document set is rated low, reducing reliability of the extracted data

Credit Vintages

IssuedRetiredAvailable
2022
57,596057,596
2023
66,026066,026
Total123,6220123,622

Risk Indicators

Additionality

VVB-confirmed but material finding of incorrect demonstratio

Permanence

Buffer pool not stated; reversal risk marked not addressed

Leakage

0% deduction with contradictory justifications across docume

Baseline

Project-specific baseline; measured per VR but modeled per P

Safeguards

FPIC conducted, grievance mechanism present, safeguards docu

Double-claim

CORSIA and CCP eligibility not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.H, AMS-I.D

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents