VCSWaste handling and disposalMalaysia Registry: RegisteredAMS-III.H

Monsoon Methane Avoidance from Industrial Wastewater in Malaysia Grouped Project

VCS-4279 ↗

#13of 16 in Malaysia#1008of 1339 in Verra (VCS)#34of 55 in AMS-III.H

4.5/ 10
Integrity
4.8
Transparency
4.8
Claim Safety
4.5
Documentation
3.5

Audit Analysis

A grouped methane-recovery project across five Malaysian palm-oil mills with VVB-verified additionality and a reasonable pro-rata delivery ratio (~112%), but undermined by a very large volume of material findings (30+), 23 corrective actions, a contradiction on whether methane capture was legally required, a thin leakage justification, and low extraction confidence across the document set. The project is functional and registered, but the data-quality and documentation gaps materially weaken confidence in the claimed reductions.

Red Flags

  • Contradiction on whether methane capture was legally required: the 2026 verification report states it was not, while the 2023 stakeholder consultation record states it was — a direct additionality concern that was not fully resolved.
  • 30+ material findings and 23 corrective actions in the verification report, including errors in ER calculation formulas for all five PAIs, missing Scope 3 emissions data, missing environmental risk information, and an incomplete Section 2.6.
  • Lifetime ex-ante ERR discrepancy of ~24% between the 2026 verification report (256,307 tCO₂e) and the 2024 monitoring report (338,352 tCO₂e), with no clear reconciliation.
  • FPIC was not conducted, and the grievance mechanism details required correction per the verification report.
  • Leakage deduction of 0% justified only as 'deemed negligible' with no quantified analysis, despite the project involving open wastewater treatment systems where methane escape is plausible.

Credit Vintages

IssuedRetiredAvailable
2023
26,44825,4481,000
2024
10,10310,1030
Total36,55135,5511,000

Risk Indicators

Additionality

VVB-verified but legal-requirement contradiction unresolved

Permanence

mixed evidence / unresolved risk

Leakage

0% deduction, 'deemed negligible' only

Baseline

Project-specific, mixed measured/modeled, no reassessment yet due

Safeguards

Grievance mechanism present, FPIC not conducted, corrections needed

Double-claim

CORSIA and CCP statuses both unstated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AMS-III.H.: Methane recovery in wastewater treatment

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents