Skip to main content
VCSEnergy industries (renewable/non-renewable sources); Waste handling and disposalThailand Registry: RegisteredAMS-III.H

VP Biosupply Wastewater Treatment and Biogas Utilization Project

VCS-415 ↗

#52of 268 in Biogas#17of 48 in Thailand#560of 1339 in Verra (VCS)#12of 55 in AMS-III.H

5.3/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
5.5
Documentation
5.0

Audit Analysis

A long-running Thai wastewater-to-biogas project with VVB-confirmed regulatory additionality and no reversal risk, but plagued by persistent data-quality issues, multiple methodology deviations, and a 206% over-delivery versus ex-ante estimates that was never adequately assessed. The project's integrity is further weakened by the absence of a stated buffer pool and a project-specific modeled baseline relying on a 2017 grid emission factor.

Red Flags

  • Achieved GHG emission reductions are 206.63% higher than ex-ante estimates, yet the verification report notes no assessment of the additionality implications or whether project design changes drove the increase
  • Multiple recurring methodology deviations across monitoring periods: destruction efficiency set to 100% for combusted biogas, baseline thermal energy estimated from historical fuel-oil consumption rather than direct measurement, and flare efficiency set to 0%
  • Significant ERR figure discrepancies across documents: the monitoring report claims 27,604 tCO2e, the verification report records 3,853 tCO2e, and the issuance document shows 84,642 tCO2e — the basis for each figure is unclear
  • Low extraction confidence across 47 source documents, indicating at least one key document was poorly readable or incomplete

Credit Vintages

IssuedRetiredAvailable
2006
12,38512,3850
2007
17,08817,0880
2008
5,6645,6640
2009
19,80119,8010
2010
20,00420,0040
2011
5,3305,3300
2012
31,20531,2050
2013
22,91022,9100
2014
46,11346,1130
2015
48,70548,306399
2016
38,25038,2500
2017
45,36145,3610
2018
59,99359,9930
2019
40,04140,0410
2020
52,10436,97815,126
2021
29,2553,33325,922
2022
700149551
Total494,909452,91141,998

Risk Indicators

Additionality

VVB-confirmed regulatory test

Permanence

mixed evidence / unresolved risk

Leakage

Deemed negligible, reasonable for wastewater-biogas

Baseline

Project-specific modeled baseline, 2017 grid EF

Safeguards

Grievance mechanism and benefit sharing present; FPIC not st

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-30AMS-III.H, AMS-I.C

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents