KIS BIOFUELS- UKINDO PROJECT

VCS-4705 ↗

#81of 352 in Biomass#12of 33 in Indonesia#605of 1339 in Verra (VCS)#15of 55 in AMS-III.H

5.2/ 10
Integrity
6.2
Transparency
4.2
Claim Safety
5.2
Documentation
4.5

Audit Analysis

The KIS BIOFUELS UKINDO project is a newly registered VCS waste-handling project in Indonesia with a confirmed investment-test additionality and a quantified 1.25% leakage deduction, but it lacks a buffer pool, has no monitoring data yet, and carries several unresolved contradictions between the PDD and validation report. The low extraction confidence and absence of verified emission-reduction figures limit the ability to confirm claim safety.

Red Flags

  • 19 Corrective Action Requests were raised during validation (all closed), indicating significant documentation or design issues that had to be remediated
  • FPIC status is contradictory: the validation report (Oct 2025) confirms FPIC was conducted, while the PDD (dated Feb 2026) records it as not conducted
  • Leakage treatment changed from 'deemed negligible' (0%) in the 2023 PDD to a quantified 1.25% deduction in the 2025 validation report, suggesting the initial baseline was under-conservative
  • Minimum extraction confidence is rated low, meaning at least one key document was poorly readable and data completeness cannot be fully assured

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

no reversal data yet

Leakage

1.25% quantified deduction

Baseline

Project-specific, measured; no reassessment date

Safeguards

FPIC contradictory; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-09AMS-III.H

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents