Wastewater Treatment With Biogas System In Palm Oil Mill At Sawi, Chumporn,Thailand
Score Breakdown
Integrity
verified Additionality is confirmed by the VVB (monitoring report, 2018).
missing Leakage is not consistently treated and no leakage deduction is evidenced (validation report, 2012 vs monitoring report, 2018).
Transparency
verified Monitoring period is clearly stated (2012-06-01 to 2016-05-31) and the VVB is identified as KBS Certification Services (monitoring report, 2018).
missing Multiple cross-document inconsistencies (safeguards, FPIC, ER totals, crediting period) reduce MRV clarity and comparability.
Claim Safety
missing ER totals conflict across documents (validation report, 2012 vs later record showing 104,426), increasing greenwashing/over-crediting risk.
inferred CORSIA and CCP status are not found in the extracted record, limiting safe downstream claims.
Documentation
verified A relatively strong document set is present (10 documents; monitoring report, validation report, PDD) with high extraction confidence.
missing Corrective actions were required, including a deviation due to lack of monitoring for a parameter, indicating documentation/control weaknesses (monitoring report, 2018).
Detailed Analysis
Integrity
The monitoring report (2018) indicates additionality was confirmed by the VVB, supporting the project’s additionality case. However, leakage handling is weak: the validation report (2012) deems leakage negligible while the monitoring report (2018) indicates leakage was not addressed, and no leakage deduction percentage is evidenced in the extracted record. Corrective actions and a deviation due to lack of monitoring for a parameter (monitoring report, 2018) also reduce confidence in operational controls relevant to robust quantification.
Transparency
Key MRV elements are available, including the monitoring period (2012-06-01 to 2016-05-31) and the VVB name (monitoring report, 2018). Transparency is reduced by inconsistencies across documents on safeguards/FPIC/grievance and by conflicting ER totals and crediting-period dates, which makes it harder for third parties to reconcile what was implemented and credited. The record does not provide a clear leakage deduction value or usage monitoring method, leaving gaps in how key parameters were tracked.
Claim Safety
Over-crediting/communications risk is elevated because the verified ER figure differs across documents (an earlier validation report in 2012 shows 91,121 while a later record shows 104,426). Leakage is also not consistently justified (negligible vs not addressed), which can undermine defensibility of climate claims for an avoidance biogas project. CORSIA eligibility and CCP status are not found in the extracted record, so the project should not be marketed as meeting those labels without independent confirmation.
Documentation
The extracted record draws on a reasonably broad evidence base (10 documents including monitoring report, validation report, and PDD) and the minimum extraction confidence is high, supporting document reliability overall. Still, the monitoring report (2018) lists corrective actions (including correction of reported data and a deviation due to lack of monitoring), which signals that documentation and data management were not fully audit-ready at draft stage. Contradictory statements across monitoring/validation documents on safeguards and crediting period further weaken documentary coherence.
Overall
This project scores mid-range because it has VVB-confirmed additionality and a defined monitoring period, but material inconsistencies reduce confidence in the record. Contradictions were handled conservatively by privileging the more recent monitoring report (2018) for safeguards/FPIC/grievance and leakage treatment (treated as not adequately addressed), since it reflects later reporting and implementation; this choice lowers integrity and claim-safety due to unresolved leakage. For ER totals, the higher later figure (104,426) was treated as the current verified value, but the discrepancy versus the earlier 91,121 is a reliability red flag that depresses transparency and claim-safety. The crediting-period contradiction (2006–2016 vs 2016–2026) was treated as unresolved; the monitoring report’s dates were used for recency context, but the inconsistency reduces confidence in what period is actually being credited.
Audit Analysis
This VCS biogas wastewater project has VVB-confirmed additionality and a clear monitoring period, but several internal inconsistencies across documents weaken confidence in key claims. Leakage treatment is unclear and the verified ER figure conflicts with earlier documents, increasing over-crediting and communications risk.
Project Description
The Natural Palm Oil (Chumporn) Co., Ltd. (NPO) has implemented a project to reduce methane emissions from their palm oil factory, which has a capacity of 45-60 tons of fresh fruit bunches (FFB) per hour. Prior to the project, the wastewater from the plant was treated through a system of 8 cascading lagoons, resulting in methane generation. The project has successfully reduced methane emissions by implementing a new wastewater treatment system.
Red Flags
- Verified emission reductions are inconsistent across documents (104,426 vs 91,121), creating over-crediting and reporting risk.
- Leakage is treated inconsistently (earlier “negligible” vs later “not addressed”), with no quantified leakage deduction found.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 34,379 | 34,379 | 0 | |
| 2010 | 59,042 | 59,042 | 0 | |
| 2011 | 44,562 | 44,234 | 328 | |
| 2012 | 14,299 | 2,469 | 11,830 | |
| 2013 | 29,441 | 0 | 29,441 | |
| 2014 | 27,932 | 0 | 27,932 | |
| 2015 | 15,963 | 0 | 15,963 | |
| 2016 | 19,260 | 4,426 | 14,834 | |
| Total | 244,878 | 144,550 | 100,328 |
Cosa migliorerebbe questo punteggio
- Publish a clear, consistent leakage assessment (including whether leakage is negligible and any quantified deduction) aligned across validation and monitoring documents.
- Reconcile and publicly explain the ER total discrepancy and the crediting-period date inconsistency with a single authoritative registry-linked statement and updated monitoring/verification documentation.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed additionality
Avoidance project; no reversal events evidenced
Leakage not consistently justified; no deduction evidenced
Project-specific baseline; reassessment timing limited
Safeguards/FPIC reported but inconsistent across years
CORSIA/CCP status not found in record
Where to buy
Marketplaces
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →