Chorchaiwat Wastewater Treatment and Biogas Utilization Project
#11of 111 in Biogas#5of 22 in Thailand#201of 629 in Verra (VCS)
Audit Analysis
A long-running Thai wastewater biogas project (operating since 2007, now in its second 10-year crediting period) with VVB-confirmed additionality and no reversal events, but held back by a project-specific baseline, absence of a buffer pool, a 0% leakage deduction justified only as 'deemed negligible,' and a notable volume of corrective action requests and material findings across verification cycles. The 2025 verification report confirms ERR figures of 34,000 tCO₂e for the 2021–2023 monitoring period, with 2022 data conservatively excluded due to missing evidence.
Red Flags
- Eight Corrective Action Requests and one Clarification Request were raised in the 2025 verification, covering IRR/NPV double-counting, gas flow unit errors (m³ vs Nm³), methodology version compliance, and baseline scenario issues — indicating recurring documentation and calculation weaknesses.
- No buffer pool percentage is stated in any available document, leaving permanence risk unmitigated despite the project's avoidance-type design.
- Leakage deduction is 0% with a justification of 'deemed negligible' (2025 report), a shift from the earlier 'quantified' treatment in the 2021 verification, and no quantified leakage analysis is provided.
- The PDD dates from 2009 and the project-specific baseline was last reassessed in 2017; while the next VCS-mandated reassessment is not yet due (10-year interval from 2017), the baseline has not been updated in over seven years.
- Eleven contradictions were identified across documents, including shifts in FPIC status, grievance mechanism presence, safeguards documentation, and leakage justification between the 2017 and 2025 verification reports.
Credit Vintages Exhausted
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 5,176 | 5,176 | 0 | |
| 2008 | 6,512 | 6,512 | 0 | |
| 2009 | 9,676 | 9,676 | 0 | |
| 2010 | 25,667 | 25,667 | 0 | |
| 2011 | 31,539 | 31,539 | 0 | |
| 2012 | 29,107 | 29,107 | 0 | |
| 2013 | 23,499 | 23,499 | 0 | |
| 2014 | 22,567 | 22,567 | 0 | |
| 2015 | 21,397 | 21,397 | 0 | |
| 2016 | 22,325 | 22,325 | 0 | |
| 2017 | 22,672 | 22,672 | 0 | |
| 2018 | 22,632 | 22,632 | 0 | |
| 2019 | 27,243 | 27,243 | 0 | |
| 2020 | 22,743 | 22,743 | 0 | |
| 2021 | 11,324 | 11,324 | 0 | |
| Total | 304,079 | 304,079 | 0 |
Risk Indicators
VVB-confirmed regulatory-surplus test
No buffer pool stated; no reversals
0% deduction, 'deemed negligible' only
Project-specific, modeled, last reassessed 2017
FPIC, grievance mechanism, safeguards documented (2025)
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →