Biogas from Ethanol Wastewater for Electricity Generation
#46of 111 in Biogas#11of 22 in Thailand#121of 213 in CDM (UNFCCC)#123of 417 in AMS-I.D
Audit Analysis
A CDM biogas project in Thailand using standardised AMS methodologies, with a combined additionality test and no reported reversal events. However, a 20-fold discrepancy in claimed emission reductions between two monitoring reports, a project-specific modeled baseline, and contradictory leakage justifications significantly undermine confidence in the credit quantity and baseline robustness.
Red Flags
- 20-fold discrepancy in total ERR claimed (340 vs 6,913 tCO2e) between two monitoring reports dated 10 days apart (2019-08-19 vs 2019-08-29), raising serious over-crediting or data-integrity concerns
- Leakage justification contradicts itself across documents: the validation report (2018) states leakage was 'deemed negligible' while the monitoring report (2019) states it was 'quantified', yet the deduction is 0% in both cases
- Monitoring period covers only 14 days (2018-07-10 to 2018-07-24), which is extremely short for a continuous biogas generation project and raises representativeness concerns
- Baseline validity assessment tool application was initially missing (CAR 02 in the validation report), indicating a procedural gap in the additionality/baseline assessment
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2019 | 2,625 | 0 | 2,625 | |
| 2020 | 1,688 | 0 | 1,688 | |
| Total | 4,313 | 0 | 4,313 |
Risk Indicators
Combined test applied; VVB sign-off not explicitly confirmed
No buffer pool or permanence mechanism stated; no reversals
0% deduction with contradictory justification across documen
Project-specific modeled baseline; CAR noted missing validit
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →