Skip to main content
CDMMethane avoidanceIndonesiaAMS-III.H

Biogas project, BAJ Terbanggi

CDM-2650 ↗

#80of 111 in Biogas#13of 17 in Indonesia#177of 213 in CDM (UNFCCC)#15of 22 in AMS-III.H

4.3/ 10
Integrity
5.2
Transparency
3.0
Claim Safety
4.5
Documentation
3.8

Audit Analysis

A small CDM biogas project in Indonesia with a standard investment-test additionality assessment and a minor, corrected material finding, but significant gaps in permanence protection (no buffer pool), weak leakage justification (0% deemed negligible), and a notable contradiction in claimed ERR figures between the PDD and an unidentified source. No monitoring or verification data is available in the extracted record, limiting confidence in actual delivery.

Red Flags

  • No buffer pool or permanence mechanism identified for a biogas project where system failure would resume methane emissions
  • Contradiction in total ERR: PDD states 70,296 tCO2e while an unidentified source reports 492,072 tCO2e — a 7× discrepancy with no resolution
  • Leakage deduction of 0% justified only as 'deemed negligible' in the PDD, while another source references a 'quantified' treatment — inconsistent treatment of a material risk for biogas
  • No monitoring reports or verification reports available in the extracted record; actual delivery cannot be confirmed

Credit Vintages

IssuedRetiredAvailable
2012
26,493026,493
2013
62,363062,363
2015
61,048061,048
2016
33,586033,586
Total183,4900183,490

Risk Indicators

Additionality

Investment test present; VVB sign-off not confirmed in recor

Permanence

No buffer pool or permanence mechanism stated

Leakage

0% deduction, 'deemed negligible' — weak for biogas; contrad

Baseline

Project-specific, modeled baseline; set at registration in 2

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-26AMS-III.H, AMS-I.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents