Skip to main content
CDMMethane avoidanceIndonesiaAMS-III.H

BAJ Gunung Agung Factory tapioca starch wastewater biogas extraction and utilization project, Lampung Province, Republic of Indonesia

CDM-2673 ↗

#54of 111 in Biogas#10of 17 in Indonesia#134of 213 in CDM (UNFCCC)#10of 22 in AMS-III.H

4.8/ 10
Integrity
5.5
Transparency
4.0
Claim Safety
5.0
Documentation
4.5

Audit Analysis

A CDM biogas project in Indonesia using well-established AMS methodologies with a reputable VVB (JQA) and a combined additionality test, but the record lacks verified emission reduction figures, monitoring reports, and buffer pool details. The project-specific modeled baseline and a significant discrepancy in claimed ERR figures (38,910 vs. 272,370 tCO₂e) introduce moderate over-crediting risk. Overall a mid-range project with reasonable technology but incomplete verification evidence.

Red Flags

  • Total ERR claimed differs by a factor of ~7 between the validation report (38,910 tCO₂e) and an unidentified source (272,370 tCO₂e), creating uncertainty about the true credit volume.
  • No verified ERR figures or monitoring reports were found in the extracted record, preventing confirmation of actual delivery against the ex-ante estimate.
  • Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified.
  • Seven material findings (CL01–CL07) in the validation report, including clarification on methodology change from AMS-I.D to AMS-I.F and grid emission factor validity, indicate the VVB had unresolved questions at validation.

Credit Vintages

IssuedRetiredAvailable
2011
6,85806,858
2012
30,984030,984
Total37,842037,842

Risk Indicators

Additionality

Combined test, not legally required, but VVB confirmation no

Permanence

No buffer pool stated; no reversal events recorded; biogas h

Leakage

0% deduction, deemed negligible — reasonable for wastewater

Baseline

Project-specific, modeled; last reassessed 2016 at project i

Safeguards

Safeguards and benefit sharing mentioned; FPIC and grievance

Double-claim

CORSIA and CCP status both not stated; dual-channel risk not

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-25AMS-III.H, AMS-I.F

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents