BAJ Gunung Agung Factory tapioca starch wastewater biogas extraction and utilization project, Lampung Province, Republic of Indonesia
#54of 111 in Biogas#10of 17 in Indonesia#134of 213 in CDM (UNFCCC)#10of 22 in AMS-III.H
Audit Analysis
A CDM biogas project in Indonesia using well-established AMS methodologies with a reputable VVB (JQA) and a combined additionality test, but the record lacks verified emission reduction figures, monitoring reports, and buffer pool details. The project-specific modeled baseline and a significant discrepancy in claimed ERR figures (38,910 vs. 272,370 tCO₂e) introduce moderate over-crediting risk. Overall a mid-range project with reasonable technology but incomplete verification evidence.
Red Flags
- Total ERR claimed differs by a factor of ~7 between the validation report (38,910 tCO₂e) and an unidentified source (272,370 tCO₂e), creating uncertainty about the true credit volume.
- No verified ERR figures or monitoring reports were found in the extracted record, preventing confirmation of actual delivery against the ex-ante estimate.
- Buffer pool percentage is not stated in any available document, leaving permanence risk unquantified.
- Seven material findings (CL01–CL07) in the validation report, including clarification on methodology change from AMS-I.D to AMS-I.F and grid emission factor validity, indicate the VVB had unresolved questions at validation.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 6,858 | 0 | 6,858 | |
| 2012 | 30,984 | 0 | 30,984 | |
| Total | 37,842 | 0 | 37,842 |
Risk Indicators
Combined test, not legally required, but VVB confirmation no
No buffer pool stated; no reversal events recorded; biogas h
0% deduction, deemed negligible — reasonable for wastewater
Project-specific, modeled; last reassessed 2016 at project i
Safeguards and benefit sharing mentioned; FPIC and grievance
CORSIA and CCP status both not stated; dual-channel risk not
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →