FELDA Biogas Plant (Methane Recovery and Utilisation) at Sungai Tengi Palm Oil Mill, Malaysia
#223of 352 in Biomass#16of 16 in Malaysia#1331of 1459 in CDM (UNFCCC)#47of 55 in AMS-III.H
Audit Analysis
The FELDA biogas project at Sungai Tengi Palm Oil Mill has a VVB-confirmed investment additionality test and a measured project-specific baseline, but the available record is limited to validation-era documents with no monitoring reports. A ten-fold discrepancy in the claimed emission reduction figure between the PDD and the validation report, combined with an internal leakage-justification contradiction and twenty material findings, significantly undermines confidence in the project's data integrity and the reliability of its credit claims.
Red Flags
- Ten-fold discrepancy in total claimed emissions reductions: the PDD states 267,106 tCO₂e while the validation report states 26,711 tCO₂e — a factor-of-ten difference that cannot be reconciled from the available documents and raises serious data-reliability concerns.
- Internal contradiction within the PDD on leakage treatment: one section describes leakage as 'deemed negligible' while another refers to it as 'quantified,' leaving the actual leakage methodology ambiguous.
- Twenty material findings and corrective actions were raised during validation, including missing equipment specifications, incomplete project-boundary description, and unsupported financial-analysis assumptions, indicating the PDD required substantial revision before approval.
- No monitoring reports, verified emission figures, or post-validation data are present in the extracted record, making it impossible to confirm whether the project delivered its claimed reductions.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
VVB-confirmed investment test
No reversal data
0% deduction; PDD internally contradictory
Project-specific, measured; no reassessment data
Safeguards mentioned; FPIC and grievance not documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →