"Forced Methane extraction from Organic wastewater", at Mandya District, Karnataka by M/s Sri Chamundeswari Sugars Ltd.
Score Breakdown
Integrity
verified Additionality was confirmed by the VVB, and the project used a combined additionality test rather than relying only on a self-declared claim.
missing Leakage treatment is weak: one document says leakage was not addressed, and the extracted record shows a 0% deduction without a clear justification.
Transparency
verified The monitoring period, methodology, VVB name, and crediting period are identified in the available documents.
missing Key monitoring values are missing or not stated, including verified emissions reductions, usage-rate evidence, and the monitoring method for usage.
Claim Safety
verified The project is not presented as having material findings or corrective actions in the extracted verification record.
missing The baseline is project-specific rather than a more conservative standardized or jurisdictional baseline, and leakage justification is inconsistent across documents.
Documentation
verified Multiple document types were used, including the validation report, PDD, and monitoring report, and the extraction confidence is medium rather than low.
missing Some important fields remain not found in the available record, and the contradiction on leakage justification reduces documentation reliability.
Detailed Analysis
Integrity
The project scores moderately because additionality was confirmed by the VVB and the validation record indicates a combined test, which is stronger than a single unsupported claim. On the downside, the baseline is project-specific, the leakage treatment is weak, and the extracted record shows a 0% leakage deduction without a clear supporting rationale. No material findings or corrective actions were reported, which helps, but permanence is only partially relevant here because this is an avoidance-style wastewater methane project rather than a storage project.
Transparency
The available documents identify the VVB, methodology, monitoring period, and crediting period, which supports basic traceability. However, several core MRV fields are not stated in the extracted record, including verified emissions reductions, usage-rate evidence, and the usage monitoring method. The monitoring report date is also earlier than the stated monitoring period, which makes the documentation feel incomplete even though the extraction confidence is medium rather than low.
Claim Safety
Claim safety is middling because the project is CDM-registered and has VVB-confirmed additionality, but the evidence for conservative accounting is not strong. The baseline is project-specific, and leakage is inconsistently described across documents, with one source saying it was not addressed and another later source describing it as negligible. The project is marked CORSIA-eligible, while CCP status is not stated, so dual-claim risk is not fully resolved.
Documentation
Documentation quality is fair because multiple official document types were used and the extraction confidence is medium. The record includes the validation report, PDD, and monitoring report, but several key fields are missing or not quantified, including verified emissions reductions and usage monitoring details. The contradiction on leakage justification also lowers confidence in the completeness and consistency of the file.
Overall
Overall, this is a mid-quality CDM project with some credible safeguards and a VVB-backed additionality case, but it is held back by missing MRV detail and inconsistent leakage treatment. I privileged the validation report over the PDD for additionality because it is the later and higher-assurance document, so the combined test was favored over the earlier investment-only description. For leakage, I privileged the extracted validation-report statement that it was not addressed over the later note that it was deemed negligible, because the contradiction suggests the evidence trail is not fully reliable and the safer interpretation is to score it down.
Audit Analysis
This CDM wastewater methane project has some positive quality signals, including VVB-confirmed additionality, a grievance mechanism, FPIC, and no reported material findings. However, key MRV fields are missing, leakage treatment is weakly documented, and the record contains contradictions that reduce confidence in the evidence base.
Project Description
Status: Registered Type: PA Methodology: AMS-I.D. Project type: Biomass Energy Sub-type: Bagasse power Region: Asia & Pacific Sub-region: Southern Asia Reductions 1st period: 34.424 ktCO2e/yr
Red Flags
- Leakage is not well supported: the main extracted record says leakage was not addressed, while another document later describes it as deemed negligible.
- The project is CORSIA-eligible, but CCP status is not stated, leaving some residual double-claim uncertainty.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2011 | 26,630 | 0 | 26,630 | |
| 2012 | 28,027 | 0 | 28,027 | |
| Total | 54,657 | 0 | 54,657 |
Cosa migliorerebbe questo punteggio
- Provide a clear, document-backed leakage assessment and reconcile the 0% deduction with the later statement that leakage was deemed negligible.
- Publish complete MRV evidence for verified emissions reductions and usage monitoring, including the missing quantified values and supporting calculations.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed combined test
No reversal evidence, but buffer not stated
Leakage treatment inconsistent
Project baseline, reassessment not stated
FPIC and grievance mechanism present
CORSIA-eligible, CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →