Grid emission factor: the methodology sets rules for it (AMS-I.D v18 para 23, p. 7). CarbonMeld reads it in the project's documents. CM-F-AMS-I-D-GRID-EF
AMS-I.D — Grid connected renewable electricity generation
About this methodology
Projects build or upgrade renewable power generation connected to an electricity grid. The method measures emissions avoided by displacing other generation on that grid.
- Issued by
- CDM (UNFCCC) · issuer's site
- Version
- 18.0 · source ·
- Status
- Active at CDM / UNFCCC · source ·
- Climate outcome
- Emission reductions
- Activity
- Electricity
- Official page
- cdm.unfccc.int ·
- Also used by projects of
- Verra (VCS) (408 projects)
- Global Carbon Council (GCC) (285 projects)
- Universal Carbon Registry (UCR) (268 projects)
6 more
- Gold Standard (GS) (235 projects)
- International Carbon Registry (ICR) (16 projects)
- CerCarbono (CC) (9 projects)
- BioCarbon Registry (BCR) (6 projects)
- ITMO Registry (ITMO) (3 projects)
- Global Carbon Registry (GCR) (1 project)
How methodology v3 reads projects of this type
What CarbonMeld reads
- shown
A confirmed investment analysis A-INVEST
The documents show a project-level additionality test, the validation confirmed it, and it is an investment analysis (a numeric test of the project's finances with and without carbon revenue).
Deductions that can apply
No additionality test in the documents (renewable energy) A-TEST-NOT-STATED
Renewable energy, power generation and supply: the documents read state no additionality test. A test that the documents do not name is a different case. It takes no points. CarbonMeld applies this rule only where a check of the documents has confirmed its condition; without that check, the rule takes no points.
Set by the methodology or the programme, not assessed by our current method
- not assessed
Leakage: the methodology sets rules for it in some cases (AMS-I.D v18 §5.7, p. 12). Our current method does not assess it. CM-F-AMS-I-D-LEAKAGE
- not assessed
Sustainability of the feedstock: the methodology sets rules for it in some cases. Our current method does not assess it. CM-F-AMS-I-D-FEEDSTOCK-SUSTAINABILITY
- not assessed
Social safeguards and consent of communities (FPIC): any such rules come from the programme, not the methodology. Our current method does not assess it. CM-F-AMS-I-D-SAFEGUARDS-FPIC
Not applicable to this type — never a gap in our current method
The criterion does not apply to this methodology. Our current method never counts it as a gap.
- CM-N-BUFFERBuffer pool
- CM-N-PERMANENCE-REVERSALPermanence and reversals
- CM-N-FNRBFraction of non-renewable biomass (fNRB)
- CM-N-USAGEUsage rate of the devices
- CM-N-REGULATORY-SURPLUSNo legal requirement for the activity
- CM-N-DURABILITY-MEASUREMENTDurability of the storage
- CM-N-END-USE-TRACKINGTracking of the end use
The general rules apply as well. Read the general rules.
The rules of methodology v2.2, as they were: the archived v2.2 page.
History and transitions
All 18 versions · current v18.0
-
v18.0adopted 28 Nov 2014currentsource
Introduce the methodological tool “Project emissions from cultivation of biomass”; Streamline procedure to estimate project emissions associated with biomass cultivation across large and small scale methodologies; Remove restrictions for …
-
v17.0adopted 3 Jun 2011source
To simplify the monitoring requirements for quantity, net calorific value and moisture content of biomass. To clarify the applicability conditions.
-
v16.0adopted 28 May 2010source
To distinguish the project activities solely supplying renewable electricity to a grid from activities displacing electricity from a grid. The parameters to be monitored including the frequency and QA/QC procedures are also included.
-
v15.0adopted 16 Oct 2009source
To include the procedures to calculate project emissions for hydropower with reservoirs as specified in Annex 5 of EB 23.
-
v14.0adopted 17 Jul 2009source
To include more guidance on: the monitoring of electricity generated; calculation of project emissions for geothermal project activities; and editorial changes.
-
v13.0adopted 14 Dec 2007source
To refer directly to the “Tool to calculate the emission factor for an electricity system” for reasons of clarity.
-
v12.0adopted 27 Jul 2007source
To allow for their application under a programme of activities (PoA), where the limit of the entire PoA exceeds the limit for small-scale CDM project activities.
-
v11.0adopted 4 May 2007source
To include guidance on monitoring of biomass project activities. All small-scale biomass project activities applying AMS-I.D. (firing only biomass or firing biomass and fossil fuel) are required to monitor the biomass and any fossil fuel …
-
v10.0adopted 15 Dec 2006source
-
v09.0adopted 21 Jul 2006source
An amendment to the procedure for estimating the combined margin emission factor of AMS-I.D, making it thereby consistent with ACM0002.
-
v08.0adopted 24 Feb 2006source
To: (i) include provisions for retrofit and renewable energy capacity additions as eligible activities; (ii) Provide clarification for baseline calculations under Category I.D; and (iii) Provide clarification on the applicability of …
-
v07.0adopted 25 Nov 2005source
References to “non-renewable biomass” in Appendix B deleted.
-
v06.0adopted 30 Sept 2005source
Guidance on consideration of non-renewable biomass in Type I methodologies, thermal equivalence of Type II GWhe limits included.
-
v05.0adopted 25 Feb 2005source
Guidance on ‘capacity addition’ and ‘cofiring’ in Type I methodologies and monitoring of methane in AMS-III.D included.
-
v04.0adopted 22 Oct 2004source
AMS-II.F was adopted, leakage due to equipment transfer was included in all Type I and Type II methodologies.
-
v03.0adopted 14 Jun 2004source
New methodology AMS-III.E was adopted.
-
v02.0adopted 28 Nov 2003source
Definition of build margin included in AMS-I.D, minor revisions to AMS-I.A, AMS-III.D, AMS-II.E.
-
v01.0adopted 21 Jan 2003source
Initial adoption. The Board at its seventh meeting noted the adoption by the Conference of the Parties (COP), by its decision 21/CP.8, of simplified modalities and procedures for small-scale CDM project activities (SSC M&P).
Top projects using AMS-I.D
This page ranks projects using AMS-I.D by their CarbonMeld document-based ratings. The rank compares project ratings; it is not a rating of the methodology itself.
507 rated projects of the 4,179 tracked in this methodology · average rating 3.2/10 · ranked by CarbonMeld's document-based rating: additionality, quantification, permanence (where carbon is stored) and claim safety. Showing the top 50.
1,923 analysed project pages, A–Z →
Which registries list projects under AMS-I.D?
In CarbonMeld's data, AMS-I.D projects are on 10 registries: CDM (2,948), Verra (408) and Global Carbon Council (285), and 7 more. Being listed on a registry is not the same as being registered: the «Registered» column counts the projects each registry shows as registered, and credits are issued only after each verification.
| Registry | Projects | Registered | Projects list |
|---|---|---|---|
| CDM (UNFCCC) | 2,948 | 2,006 | See the list |
| Verra (VCS) | 408 | 138 | See the list |
| Global Carbon Council (GCC) | 285 | 59 | See the list |
| Universal Carbon Registry (UCR) | 268 | 202 | See the list |
| Gold Standard (GS) | 235 | 185 | See the list |
| International Carbon Registry (ICR) | 16 | 7 | See the list |
| CerCarbono (CC) | 9 | 3 | See the list |
| BioCarbon Registry (BCR) | 6 | 6 | See the list |
| ITMO Registry (ITMO) | 3 | 0 | See the list |
| Global Carbon Registry (GCR) | 1 | 0 | See the list |
Counts of project records in CarbonMeld's data, with or without a CarbonMeld analysis, so they can be larger than the ranking below. «Registered» counts the records whose current registry status is «registered», as last read (25 November 2026); projects in a later status, such as awaiting verification approval, late to verify or completed, are not in that column.
- 4 4
- 5 4
- 6 3.9
- 7 3.9
- 8 3.9
- 9 3.9
- 10 3.9
- 11 3.9
- 12 3.9
- 13 3.9
- 14 3.9
- 15 3.9
- 16 3.8
- 17 3.8
- 18 3.7
- 19 3.7
- 20 3.7
- 21 3.7
- 22 3.7
- 23 3.6
- 24 3.6
- 25 3.6
- 26 3.6
- 27 3.6
- 28 3.6
- 29 3.6
- 30 3.6
- 31 3.6
- 32 3.6
- 33 3.6
- 34 3.6
- 35 3.6
- 36 3.6
- 37 3.6
- 38 3.6
- 39 3.5
- 40 3.5
- 41 3.5
- 42 3.5
- 43 3.5
- 44 3.4
- 45 3.4
- 46 3.4
- 47 3.4
- 48 3.4
- 49 3.4
- 50 3.4