Puringla Sazagua Small Scale Hydropower Project
GS-723 ↗ · current registry ID: GS4253
#1899of 1935 in Renewable energy#20of 20 in Honduras#1791of 1801 in Gold Standard (GS)#801of 806 in AMS-I.D
Audit Analysis
The Puringla Sazagua small-scale hydropower project (part of the Guacamaya PoA) carries a critical eligibility defect: the 2022 verification report explicitly states the project is not eligible for Gold Standard certification due to an expired crediting period and a rejected UNFCCC renewal. Additionality was not confirmed by the VVB in the most recent verification, and multiple meter calibration failures and data errors undermine the reliability of the verified emission reductions.
Red Flags
- The 2022 verification report explicitly states: 'The project has an expired crediting period,' 'The renewal request has been rejected by UNFCCC,' and 'Hence this is not eligible for GS certification.'
- Additionality was NOT verified by the VVB per the 2020 verification report, contradicting the 2014 validation report which had confirmed it.
- Multiple faulty meters detected during calibration (errors up to 6.408% above threshold) in CPA 0003 and VPA 0003, requiring retroactive adjustments to ER calculations.
- The project's crediting period (2012–2019) expired before the monitoring period (2019–2020) ended, creating a temporal gap in eligibility.
- Leakage justification is contradictory: the 2020 verification report describes it as 'quantified' while the 2022 monitoring report describes it as 'deemed negligible,' yet the deduction is 0%.
Credit Vintages
No issuances recorded on the registry.
Risk Indicators
Not verified by VVB in 2020 verification
Avoidance project, no reversal risk
0% deduction, contradictory justification
Project-specific, no reassessment date, contradictory
Mentioned in VR but absent in MR, FPIC not stated
CORSIA and CCP status both unknown
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →