Skip to main content
GSOtherSri LankaAMS-I.D

10MW Iris (Baruthankanda) Solar Power Project (2018-SOP-004-10.0MW)

GS-3441 ↗ · current registry ID: GS11420

#350of 770 in Renewable energy#5of 7 in Sri Lanka#246of 426 in Gold Standard (GS)#115of 417 in AMS-I.D

5.0/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.5

Audit Analysis

A 10 MW solar project in Sri Lanka registered under Gold Standard with VVB-confirmed additionality and reasonable safeguards, but undermined by five cross-document contradictions (baseline method, leakage justification, crediting period, additionality test type, and ERR figures), multiple material findings including meter calibration gaps, and CDM-era corrective actions that create governance ambiguity. The exact match between claimed and verified ERR (65,781 tCO₂e) alongside a 2022 report showing 118,562 tCO₂e raises questions about the consistency of the monitoring record.

Red Flags

  • Five contradictions across key fields (additionality test type, ERR, baseline method, leakage justification, crediting period) between the 2022 and 2023 monitoring reports and the validation report
  • Claimed and verified ERR are identical (65,781 tCO₂e) while a 2022 monitoring report reports 118,562 tCO₂e, creating an unresolved discrepancy of ~80%
  • Corrective actions reference CDM PoA terminology (DNA LoA, CPA-DD, CME coordination) in a Gold Standard project, suggesting either a CDM-to-GS conversion with incomplete documentation or misattributed findings
  • Meter calibration gaps in Nov–Dec 2021 and Dec 2022 with a 1% maximum permissible error applied, flagged as a material finding
  • Baseline method is stated as 'project' in the verification report but 'jurisdictional' in the same-dated monitoring report

Credit Vintages

IssuedRetiredAvailable
2019
2,10802,108
2020
14,87911,9882,891
2021
14,215014,215
2022
14,122014,122
Total45,32411,98833,336

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

Solar (low reversal risk) but no buffer pool stated

Leakage

0% deduction, justification contradicted across reports

Baseline

Method contradicted (project vs jurisdictional); no reassess

Safeguards

FPIC, grievance mechanism, benefit sharing documented

Double-claim

CORSIA and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents