Birahi Ganga Hydro Electric Project
GS-806 ↗ · current registry ID: GS4546
#356of 975 in India#403of 1801 in Gold Standard (GS)#250of 806 in AMS-I.D
Audit Analysis
The Birahi Ganga small hydro project displaces grid electricity using a standard AMS methodology with VVB-verified additionality, but is undermined by a serious contradiction over whether Free, Prior and Informed Consent was actually conducted, a project-specific (rather than jurisdictional) baseline, and an extensive list of missing operational documents (commission certificate, PPA, O&M agreement, meter readings) that triggered numerous corrective action requests across multiple verification cycles.
Red Flags
- FPIC contradiction: the 2021 verification report states FPIC was conducted, but the more recent 2023 validation report states it was not — a fundamental safeguard gap if the latter is correct
- Reversal events are listed as 'not addressed' in the extracted record, and no buffer pool percentage is stated, leaving permanence risk unquantified
- Critical operational documents (commission certificate, PPA, O&M agreement, monthly meter readings, ER calculation sheet) were missing and had to be requested via CARs, undermining confidence in the verified ERR of 35,026 tCO₂e
- CORSIA eligibility is confirmed while CCP status is not stated, creating a potential dual-channel allocation risk
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 3,666 | 0 | 3,666 | |
| 2015 | 22,964 | 0 | 22,964 | |
| 2016 | 21,806 | 0 | 21,806 | |
| 2017 | 2,473 | 0 | 2,473 | |
| 2018 | 21,150 | 0 | 21,150 | |
| 2019 | 4,787 | 0 | 4,787 | |
| Total | 76,846 | 0 | 76,846 |
Risk Indicators
VVB-confirmed investment test
mixed evidence / unresolved risk
0% deduction, reasonable for grid-connected hydro
Project-specific baseline, reassessed 2023
FPIC not conducted per 2023 validation report
CORSIA-eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →