Solar for Forest
Score Breakdown
Integrity
verified The verification report from Re Carbon Ltd. reports no material findings and no corrective actions required.
missing Additionality was not clearly documented in the extracted record, and the baseline is project-specific rather than a recently reassessed standardized baseline.
Transparency
verified The monitoring period and crediting period are both stated, and the project has a named VVB in the verification report.
missing The extracted record does not provide a verified ERR total, and key monitoring details such as usage monitoring and FNRB treatment are not stated.
Claim Safety
verified The project has a leakage deduction of 0%, which suggests no explicit leakage claim was made in the final verification record.
missing The contradiction on leakage justification raises over-crediting risk, and CORSIA eligibility / CCP status are not stated.
Documentation
verified The record includes a verification report date, a VVB name, and multiple supporting project facts.
missing Extraction confidence is low, only one evidence document is identified, and several important fields are not found in the available documents.
Detailed Analysis
Integrity
The verification report by Re Carbon Ltd. reports no material findings and no corrective actions required, which is a positive sign for implementation quality. However, additionality is not clearly evidenced in the extracted record because the test type and VVB confirmation are not stated, and the baseline is described only as project-based. Leakage treatment is also weak because the record says leakage justification is not addressed, even though a 0% leakage deduction is recorded.
Transparency
The monitoring period from 2017-10-01 to 2020-09-30 and the crediting period are both stated, and the project has a named verifier. Still, the extracted record does not include a verified emission reduction total, and key MRV details such as usage monitoring and FNRB treatment are not found. The low extraction confidence further reduces confidence that the documentation is complete.
Claim Safety
Claim safety is weakened by the lack of a verified ERR figure in the extracted record and by the inconsistent leakage treatment. The contradiction shows one document describing leakage as deemed negligible, while the later verification report says leakage was not addressed; I privileged the later verification report because it is more recent and more directly tied to the final assurance outcome. CORSIA eligibility and CCP status are not stated, so dual-claim risk cannot be ruled out from the available evidence.
Documentation
Documentation quality is limited by low extraction confidence and the fact that only one evidence document is identified in the extracted record. Although the verification report is dated 2022-04-18 and the project facts include safeguards such as FPIC and a grievance mechanism, several key fields are missing or not stated, including verified emissions, additionality test type, and usage monitoring. This is enough to keep the documentation score below average.
Overall
The project shows some positive signs, especially the presence of safeguards, a named verifier, and a clean verification outcome with no material findings. However, the evidence is incomplete and the reliability of the record is weakened by low extraction confidence and a direct contradiction on leakage justification; I privileged the later verification report dated 2022-04-18 over the earlier 2022-04-10 statement because it is more recent and likely reflects the final position. Because the contradiction affects a core crediting assumption and several key fields are not stated, the overall assessment remains cautious.
Audit Analysis
This project has some positive safeguards and a verified monitoring period, but the evidence base is thin and several core quality elements are not clearly documented. The biggest concerns are weak additionality evidence, leakage treatment that is inconsistent across documents, and low extraction confidence from the available records.
Project Description
Developer: GTE KARBON SUSTAINABLE ENERJI EGITIM DANISMANLIK VE TICARET A.S. Type: Solar Thermal - Electricity Size: Micro scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2014-08-01 → 2021-07-31 Estimated annual credits: 500 tCO2e SDGs: Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth, Goal 13: Climate Action
Red Flags
- Additionality is not clearly evidenced in the extracted verification record, and the specific test type is not stated.
- Leakage treatment is inconsistent: one document says leakage was deemed negligible, while the later verification report says it was not addressed.
- No verified emission reduction figure is available in the extracted record, and the project has low extraction confidence.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 181 | 181 | 0 | |
| 2015 | 449 | 449 | 0 | |
| 2017 | 87 | 87 | 0 | |
| 2018 | 426 | 426 | 0 | |
| 2019 | 434 | 100 | 334 | |
| 2020 | 361 | 7 | 354 | |
| Total | 1,938 | 1,250 | 688 |
Cosa migliorerebbe questo punteggio
- Provide the full verification and monitoring evidence showing the additionality test, baseline rationale, and verified emission reduction total.
- Resolve the leakage contradiction with a clear, documented justification and publish the registry status for CORSIA eligibility and CCP approval.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
additionality not clearly evidenced
reversal risk not addressed
leakage treatment inconsistent
project baseline only
FPIC and grievance mechanism present
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Registry Documents
monitoring
- Final_MR_652 Forest solar_v06.pdf
- Final_Ver Report_652 Forest solar_Anıl Söyler_v01.2_18-04-2022 (1).pdf
- Monitoring Report_1st monitoring period_01-08-14 to 30-11-15_v3.0.pdf
- Final_ER Calculations_652 Forest solar_v03_14-12-2021.xlsx
- V3.0-Deviation-Request-form Solar for Forest Project_GS 3305_GSdecision[18].pdf
pdd
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →