Solar for Forest
GS-1180 ↗ · current registry ID: GS3305
#255of 295 in Turkey#1259of 1801 in Gold Standard (GS)#450of 806 in AMS-I.D
Audit Analysis
Solar for Forest is a Gold Standard solar-thermal electricity project in Turkey that delivered its verified emissions reductions (1,308 tCO₂e) in line with the pro-rata expectation for the 2017–2020 monitoring period. However, the extracted record contains significant gaps: no additionality test is documented, the baseline characterisation is contradicted between the 2016 and 2022 monitoring reports, and the overall extraction confidence is low, limiting the ability to confirm key integrity and transparency elements.
Red Flags
- No additionality test type or VVB confirmation of additionality is found in the extracted record, despite Gold Standard requiring it; the low extraction confidence means this may exist in the PDD but cannot be verified.
- Baseline method is characterised as 'jurisdictional' in the 2022 monitoring report but as 'project' in the 2016 monitoring report — an unresolved discrepancy that undermines baseline confidence.
- The grid emission factor appears as 0.592 in the verification report and 0.000592 in the 2022 monitoring report, indicating a unit-conversion error (tCO₂/kWh vs kgCO₂/kWh) that, if uncorrected in calculations, would understate reductions by a factor of 1,000.
- Fifteen Corrective Action Requests were raised during verification, suggesting material issues were identified before credit issuance, even though all were closed out.
- One of the seven source documents is typed as 'unknown', and the minimum extraction confidence across the document set is rated low.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2014 | 181 | 181 | 0 | |
| 2015 | 449 | 449 | 0 | |
| 2017 | 87 | 87 | 0 | |
| 2018 | 426 | 426 | 0 | |
| 2019 | 434 | 100 | 334 | |
| 2020 | 361 | 7 | 354 | |
| Total | 1,938 | 1,250 | 688 |
Risk Indicators
Not documented in extracted record
mixed evidence / unresolved risk
0 % deemed negligible, reasonable for solar thermal
Jurisdictional per 2022, contradicted by 2016 report
Grievance mechanism and benefit sharing present, FPIC not stated
CORSIA and CCP statuses not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →