Boreas-1 Enez Wind Power Plant

GS-1160 ↗

4.9 / 10
Integrity
5.6
Transparency
4.8
Claim Safety
5.1
Documentation
3.2

Score Breakdown

Integrity

verified The validation report confirms an investment additionality test and says it was verified by the VVB.

missing Leakage is treated as negligible with a 0% deduction, but the project record does not provide much supporting detail, and reversal risk is not addressed.

Transparency

verified The monitoring period is stated, the VVB is named as Earthood Services Limited, and the verification result reports 80,690 verified ERs.

missing Total ERs claimed are not found, the usage monitoring method is not stated, and the FNRB method is missing from the available documents.

Claim Safety

verified The project uses a project baseline and the validation report supports additionality, which reduces over-crediting risk somewhat.

missing CORSIA eligibility is true while CCP status is not mentioned, and the conflicting crediting-period records create uncertainty about claim boundaries.

Documentation

verified Multiple documents were used, and the record includes safeguards such as FPIC, a grievance mechanism, and benefit sharing.

missing Extraction confidence is low, and the validation report lists many corrective actions and clarifications, indicating a documentation-heavy and somewhat messy record.

Detailed Analysis

Integrity

The validation report confirms an investment test and says additionality was verified by the VVB, which is a meaningful positive for integrity. The project also uses a project baseline and reports a 0% leakage deduction with leakage deemed negligible. Still, reversal events are not addressed and no buffer pool percentage is available, so permanence is only moderately supported.

Transparency

Transparency is limited by missing MRV detail: the usage monitoring method is not stated, the FNRB method is not found, and total ERs claimed are not available in the extracted record. On the positive side, the VVB is identified as Earthood Services Limited, the monitoring period is stated, and 80,690 ERs were verified. The low extraction confidence further reduces confidence in the completeness of the record.

Claim Safety

Claim safety is moderate because the project has a project baseline and VVB-verified additionality, which helps reduce over-crediting risk. However, CORSIA eligibility is true and CCP status is not mentioned, so the project cannot be treated as clearly excluded from dual-market claim risk. The conflicting crediting-period information also weakens confidence in the exact scope of the claim.

Documentation

Documentation quality is weak to moderate. The record includes many documents and shows safeguards such as FPIC, a grievance mechanism, and benefit sharing, but the extraction confidence is low and several key fields are missing. The validation report also lists numerous corrective actions and clarifications, suggesting the file required substantial cleanup before issuance.

Overall

I privileged the newer validation report dated 2025-07-15 over older records when resolving contradictions, because it is the most recent and likely the most authoritative summary, but the conflicts still reduce reliability. In particular, the crediting-period contradiction between the newer and older documents is material, and the benefit-sharing and leakage-treatment discrepancies show that the record is not fully consistent. Because documentation is weak and the project has many unresolved information gaps, the overall score is held to a moderate level rather than a strong one.

Audit Analysis

This is a wind project with a VVB-confirmed investment additionality test, a project baseline, and no leakage deduction, which supports moderate integrity. However, the record shows many corrective actions, low extraction confidence, missing key MRV details, and a serious crediting-period contradiction that weakens confidence in the documentation and claims.

Project Description

Developer: BOREAS Enerji retim Sistemleri Sanayi Tic. A._. Type: Wind Size: Small Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2011-05-01 → 2025-04-30 Estimated annual credits: 43200 tCO2e SDGs: Goal 8: Decent Work and Economic Growth, Goal 7: Affordable and Clean Energy, Goal 13: Climate Action

Red Flags

  • The crediting period conflicts between documents, and the newer validation report was privileged because it is more recent and appears to be the higher-priority source, but the discrepancy still raises reliability concerns.
  • Key MRV fields are missing, including the usage monitoring method, FNRB method, and buffer pool percentage, while the extraction confidence is low.

Credit Vintages

Issued Retired Available
2011
23,534 16,796 6,738
2012
37,803 756 37,047
2013
19,353 19,127 226
2015
4,720 4,720 0
2016
34,798 34,698 100
2017
31,504 31,353 151
2018
11,605 11,373 232
2019
22,193 22,192 1
2020
31,560 31,559 1
2021
31,744 31,419 325
2022
34,862 33,618 1,244
2023
32,481 31,832 649
2024
11,049 8,349 2,700
Total 327,206 277,792 49,414

Cosa migliorerebbe questo punteggio

  • Provide a complete, reconciled MRV package showing the claimed ER volume, usage monitoring method, and any FNRB or baseline calculations.
  • Resolve the crediting-period contradiction with a clear document hierarchy and publish evidence on buffer treatment, reversal risk, and claim eligibility status.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No buffer pool stated; reversal risk not addressed

Leakage

0% deduction with limited supporting detail

Baseline

Project baseline, reassessment timing unclear

Safeguards

FPIC, grievance mechanism, and benefit sharing documented

Double-claim

CORSIA-eligible; CCP status not mentioned

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.