Yaylaköy Wind Power Project, Turkey
#455of 1935 in Renewable energy#100of 295 in Turkey#239of 1339 in Verra (VCS)#160of 806 in AMS-I.D
Audit Analysis
The Yaylaköy Wind Power Project is a standard VCS renewable energy project with confirmed additionality via an investment test and a jurisdictional grid baseline. However, the permanence risk is inadequately addressed, the grid emission factor dates to 2011, and a notable discrepancy exists between the monitoring report's ERR figure (122,458) and the VVB-verified figure (72,691). Low extraction confidence across the document set and multiple inter-document contradictions reduce overall confidence in the data record.
Red Flags
- ERR discrepancy: the 2021 monitoring report reports 122,458 tCO₂e while the 2024 verification report confirms only 72,691 tCO₂e for the same monitoring period — a 41% gap that is unexplained in the available documents
- Grid emission factor of 0.5833 tCO₂/MWh is from 2011; if Turkey's grid mix has shifted toward renewables since then, the displacement benefit may be over-estimated
- Minimum extraction confidence is rated 'low', indicating at least one key document was poorly readable, reducing reliability of the extracted data
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 18,688 | 0 | 18,688 | |
| 2017 | 24,237 | 0 | 24,237 | |
| 2018 | 23,597 | 23,597 | 0 | |
| 2019 | 25,908 | 25,908 | 0 | |
| 2020 | 24,476 | 0 | 24,476 | |
| 2021 | 27,154 | 5,552 | 21,602 | |
| 2022 | 25,336 | 0 | 25,336 | |
| 2023 | 20,257 | 0 | 20,257 | |
| 2024 | 5,496 | 0 | 5,496 | |
| Total | 195,149 | 55,057 | 140,092 |
Risk Indicators
VVB-confirmed investment test
No risk rating
0% justified as negligible for grid displacement
Jurisdictional grid EF from 2011; no reassessment recorded
FPIC and grievance confirmed in 2024; contradicted in 2014 v
CORSIA and CCP status not stated in available documents
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →