Generation of electricity from 4.8MW capacity wind mills by Sun-n-Sand Hotels Private Limited at Maharashtra
#54of 975 in India#63of 1459 in CDM (UNFCCC)#38of 806 in AMS-I.D
Audit Analysis
A 4.8 MW CDM wind project in Maharashtra with a VVB-confirmed investment additionality test and a jurisdictional grid-emission-factor baseline. The project presents low permanence risk (avoidance-type, no reversal events) and a reasonable 0% leakage deduction, but suffers from internal contradictions in the monitoring report on ERR figures and baseline method, and lacks verified ERR data, CORSIA/CCP status, and explicit safeguards documentation.
Red Flags
- The monitoring report (2022-09-16) contains two different total ERR claimed values (33,615 and 28,882) within the same document, creating uncertainty about the actual credit volume.
- Baseline method is described as 'jurisdictional' in the monitoring report but 'project' in the validation report (2011-11-09), an unresolved inconsistency that affects baseline credibility.
- No verified ERR figure is available in the extracted record, preventing independent confirmation of actual emissions reductions delivered.
- CORSIA eligibility and CCP status are not stated in any available document, leaving dual-channel risk unassessed.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2023 | 62,482 | 0 | 62,482 | |
| Total | 62,482 | 0 | 62,482 |
Risk Indicators
VVB-confirmed investment test
Avoidance project, no reversal events
0% deemed negligible, justified for wind
Method contradiction between documents
Mentioned but FPIC/grievance not detailed
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.