*Salido Kecil Mini Hydropower Plant
GS-716 ↗ · current registry ID: GS423
#301of 770 in Renewable energy#6of 17 in Indonesia#194of 426 in Gold Standard (GS)#95of 417 in AMS-I.D
Audit Analysis
The Salido Kecil Mini Hydropower Plant is a Gold Standard grid-connected renewable project with VVB-confirmed additionality and documented safeguards, but it carries moderate integrity and claim-safety risks stemming from a project-specific baseline, a grid emission factor anchored to 2005, a 0% leakage deduction whose justification appears only in later monitoring reports, and significant year-to-year variability in verified emissions reductions (6,005 tCO₂e in 2022 vs 2,629 tCO₂e in 2024) linked to recurring operational outages.
Red Flags
- Grid emission factor is anchored to 2005 data (0.679 tCO₂/MWh); if Indonesia's grid has decarbonised since then, the project may be over-crediting its displacement benefit.
- Verified emissions reductions dropped from 6,005 tCO₂e (2022 monitoring report) to 2,629 tCO₂e (2024 monitoring report), a ~56% decline, driven by repeated turbine outages, controller failures, and PLN-requested shutdowns.
- The PDD (2020) did not address leakage; the 'deemed negligible' justification appears only in the 2024 monitoring report, creating a documentation gap in the project design.
- Material findings include an improperly located grievance book, an outdated office address in the PDD, and missing calibration evidence for monitoring equipment, yet no corrective actions were formally required.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2007 | 509 | 509 | 0 | |
| 2008 | 1,222 | 1,222 | 0 | |
| 2009 | 1,568 | 1,568 | 0 | |
| 2010 | 2,722 | 2,722 | 0 | |
| 2011 | 2,625 | 2,625 | 0 | |
| 2012 | 2,652 | 2,652 | 0 | |
| 2013 | 3,075 | 3,057 | 18 | |
| 2014 | 3,419 | 3,419 | 0 | |
| 2015 | 2,967 | 2,967 | 0 | |
| 2016 | 3,588 | 3,588 | 0 | |
| 2017 | 670 | 670 | 0 | |
| 2018 | 1,984 | 1,832 | 152 | |
| 2019 | 415 | 408 | 7 | |
| 2020 | 3,376 | 2,367 | 1,009 | |
| 2021 | 3,730 | 3,467 | 263 | |
| 2022 | 1,113 | 1,113 | 0 | |
| Total | 35,635 | 34,186 | 1,449 |
Risk Indicators
VVB-confirmed barrier test
Avoidance project, no buffer pool stated
0% deduction, justification absent from PDD
Project-specific, 2005 grid EF, no reassessment date
FPIC, grievance mechanism, benefit sharing documented
CORSIA and CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →