BARBAROS WIND POWER PLANT PROJECT 12 MW
GS-239 ↗ · current registry ID: GS1688
#1295of 1935 in Renewable energy#245of 295 in Turkey#1134of 1801 in Gold Standard (GS)#418of 806 in AMS-I.D
Audit Analysis
The Barbaros 12 MW wind project has sound design fundamentals — VVB-verified additionality, a jurisdictional baseline reassessed in 2024, and no reversal risk inherent to an avoidance-type renewable project. However, the verification report records 27 corrective action requests including baseline calculation errors and unclosed findings, and the project delivered only roughly 31% of its ex-ante emission reduction estimate over the first crediting period, raising concerns about the robustness of the original estimate and data quality. CORSIA eligibility without a stated CCP status introduces a residual double-claiming risk.
Red Flags
- 27 corrective action requests (CARs) and 9 clarifications (CLs) logged in the 2025 verification report, with findings explicitly noted as not yet closed
- A formal audit request (FAR) requires the next VVB to cap verified ER values to the upper bound of a sensitivity analysis, indicating the reported figures may be unreliable
- Verified cumulative ERR of 51,589 tCO₂ over the 7-year crediting period represents only ~31% of the 164,779 tCO₂ ex-ante lifetime estimate, suggesting the original projection was substantially overstated
- CORSIA eligibility is confirmed while CCP status is not stated in any available document, leaving the double-claiming channel partially unassessed
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2020 | 24,089 | 0 | 24,089 | |
| 2021 | 24,622 | 0 | 24,622 | |
| 2022 | 25,529 | 0 | 25,529 | |
| 2023 | 25,001 | 0 | 25,001 | |
| 2024 | 2,849 | 0 | 2,849 | |
| Total | 102,090 | 0 | 102,090 |
Risk Indicators
VVB-verified combined test
Avoidance project, no reversal risk
0% deduction, reasonable for wind
Jurisdictional, reassessed 2024
FPIC, grievance mechanism, benefit sharing documented
CORSIA-eligible, CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →