10MW Nedunkulam Solar PV Project (2018-SOP-002-10.0MW)

GS-3439 ↗ · current registry ID: GS11418

#419of 770 in Renewable energy#6of 7 in Sri Lanka#344of 426 in Gold Standard (GS)#145of 417 in AMS-I.D

4.5/ 10
Integrity
4.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A 10 MW solar PV project in Sri Lanka under Gold Standard with VVB-confirmed additionality and a reasonable leakage treatment, but undermined by a project-specific baseline, no stated buffer pool, unaddressed reversal risk, and a substantial list of corrective action requests and comments indicating significant data-quality and documentation gaps. The ERR figures are internally consistent for the monitored period, yet the volume of unresolved findings (four CARs, six CLs) and a 2016 grid emission factor raise meaningful over-crediting concerns.

Red Flags

  • Four Corrective Action Requests (CAR-01 to CAR-04) remain open, including failure to account for potential fossil-fuel consumption in project emissions and inconsistent LCMR data for the 2016 OM/BM calculation
  • Six Comments/Queries (CL-01 to CL-06) flag missing cross-effect analysis for the hybrid Solar PV-Wind configuration, a Prior Consideration Form submitted by a different entity (SLCF vs KOHO), and absent project boundary definitions
  • Reversal events are explicitly 'not addressed' in the verification report and no buffer pool percentage is stated, leaving permanence risk unquantified
  • Grid emission factor is from 2016 (0.759333 tCO2/MWh) with no evidence of periodic updating, potentially inflating claimed reductions
  • Meter calibration gaps for GS11419 and GS11420 during Nov–Dec 2021 and Dec 2022, with a 1% maximum permissible error applied as a workaround

Credit Vintages

IssuedRetiredAvailable
2019
1,95601,956
2020
15,12915,1290
2021
14,70212,7401,962
2022
14,951014,951
Total46,73827,86918,869

Risk Indicators

Additionality

VVB-confirmed combined test

Permanence

No buffer pool stated; reversal not addressed

Leakage

0% deemed negligible – consistent with solar PV

Baseline

Project-specific; 2016 grid EF; no reassessment stated

Safeguards

FPIC conducted; grievance mechanism present

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS-I.D.

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents