GUNAYSE HPP
GS-337 ↗ · current registry ID: GS636
#104of 295 in Turkey#236of 1801 in Gold Standard (GS)#174of 806 in AMS-I.D
Audit Analysis
The Gunayse HPP is a small hydro project under Gold Standard with a combined additionality test and a project-specific baseline. The verification report identified seven material findings and five corrective actions related to structural, operational, and record-keeping issues, which temper confidence in the project's integrity. Credit delivery for the monitoring period was approximately 86% of the pro-rata lifetime expectation, indicating no over-crediting but also no surplus.
Red Flags
- Seven material findings in the verification report, including an unobserved flood control structure, an unmitigated landslide on the reservoir slope, and incomplete HSE training records
- Five corrective actions remain open, including verification of the flood control pipe, slope mitigation, and proper fuel-bill record-keeping
- Additionality test type is recorded as 'combined' but explicit VVB confirmation of the additionality assessment is not stated in the extracted record
- Grid emission factor is from 2007 and no baseline reassessment date is recorded in any available document
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2009 | 6,381 | 5,127 | 1,254 | |
| 2010 | 16,290 | 7,473 | 8,817 | |
| 2011 | 16,216 | 16,216 | 0 | |
| 2012 | 9,492 | 9,303 | 189 | |
| Total | 48,379 | 38,119 | 10,260 |
Risk Indicators
Combined test present, VVB confirmation not explicitly stated
Hydro avoidance project, no carbon storage, no reversal risk
0% deduction, justified as negligible for small hydro
Project-specific baseline, 2007 grid EF, no reassessment date recorded
Safeguards and benefit sharing mentioned; FPIC and grievance mechanism not stated
CORSIA and CCP status both not stated; dual-channel risk not excluded
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →