Haijin Gonghe 10MWp Solar PV Project
GS-1321 ↗ · current registry ID: GS2487
#309of 1935 in Renewable energy#116of 1084 in China#132of 1801 in Gold Standard (GS)#117of 806 in AMS-I.D
Audit Analysis
The Haijin Gonghe 10 MWp solar PV project in China is a straightforward renewable-energy avoidance project with VVB-confirmed additionality, a jurisdictional baseline, and no reversal risk. Verified emissions reductions (13,105 tCO₂e for 2024) align with the ex-ante estimate and slightly exceed the pro-rata expectation, indicating no over-crediting. However, multiple contradictions across documents, two material findings, and three corrective actions temper confidence in the overall data quality.
Red Flags
- Ten contradictions identified across documents, including conflicting baseline methodology (project-specific vs. jurisdictional) and differing grid emission factors (0.8784 vs. 0.779325), raising data-reliability concerns
- Three corrective actions were required in the 2022 verification report, including updating the monitoring report period and supplementing monthly electricity data, indicating incomplete MRV at the time of verification
- Additionality test type is not stated in any available document, limiting the ability to assess the robustness of the additionality claim despite VVB confirmation
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2013 | 3,261 | 3,261 | 0 | |
| 2014 | 13,445 | 13,445 | 0 | |
| 2015 | 13,632 | 13,632 | 0 | |
| 2016 | 7,851 | 7,850 | 1 | |
| 2019 | 5,055 | 5,055 | 0 | |
| 2020 | 8,050 | 0 | 8,050 | |
| Total | 51,294 | 43,243 | 8,051 |
Risk Indicators
VVB-confirmed (CTI, 2016)
Avoidance project, no reversal risk
0% deduction, quantified justification
Jurisdictional (PDD 2022), but contradicted by 2016 report
Documented in 2022, absent in 2014; FPIC not conducted
CORSIA excluded; CCP status not stated
⚑ Dispute this rating
Are you the project owner?
Metadata correction (free)
Name, country, marketplace or links incorrect? Let us know.
Does not modify the score.
[email protected] →Pipeline re-run with new documents
Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.
Submit Documents →