Adavikanda, Kuruwita Division Mini Hydro Power Project
Score Breakdown
Integrity
verified Additionality was confirmed by TÜV NORD CERT GmbH in the verification report, using an investment test.
missing Leakage treatment is not addressed and no buffer pool or reversal management detail is stated in the available documents.
Transparency
verified The project has a named verifier and a defined monitoring period in the verification report.
missing Claimed versus verified emission reductions are not stated, and key MRV items such as usage monitoring and usage rate are not found in the extracted record.
Claim Safety
verified The project uses a project baseline under AMS-I.D, which is at least a defined methodology framework.
missing Leakage justification is not addressed, and CORSIA eligibility / CCP status are not stated, leaving residual over-claiming risk.
Documentation
verified Five document sources were used, including monitoring, validation, verification, and PDD material.
missing The verification report lists CAR 01, CAR 02, CL 01, and CL 02, showing that the documentation was not fully clean.
Detailed Analysis
Integrity
The verification report from 2019 confirms additionality through an investment test and names TÜV NORD CERT GmbH as the VVB, which supports the project’s core crediting case. However, leakage is marked as not addressed, buffer pool coverage is not stated, and the report records four findings with corrective actions required, all of which weaken integrity confidence. No reversal events are described, but permanence evidence is incomplete because the extracted record does not show how reversal risk is managed.
Transparency
Transparency is moderate at best because the project has a named verifier and a defined monitoring period, but the extracted record does not provide claimed or verified issuance totals. Important MRV details such as usage monitoring method, usage rates, and any quantified FNRB treatment are not found in the available documents. The documentation is therefore partially traceable but not fully auditable from the extracted facts alone.
Claim Safety
Claim safety is constrained by missing leakage treatment and the absence of stated CORSIA eligibility or CCP status. The project uses a project baseline under AMS-I.D, but there is no evidence here of a recent reassessment or a standardized jurisdictional baseline that would reduce over-crediting risk. Because the record does not show verified usage rates or quantified leakage deductions, the risk of overstated climate claims remains material.
Documentation
The evidence base is broader than a single report, with five document sources referenced, including monitoring, validation, verification, and PDD materials. Even so, the verification report lists four findings and required corrective actions, which suggests the file was not fully complete or fully consistent at the time of review. Extraction confidence is high, so the main documentation weakness is substantive completeness rather than readability.
Overall
The project scores in the mid-range because it has a credible additionality signal and a named VVB, but several important quality controls are missing or unresolved. I privileged the 2019 verification report over the earlier 2018 validation report where they conflicted, because it is more recent and directly reflects the verified monitoring period; this means I used the later grievance-mechanism value as false and the later, shorter crediting period. The contradictions do not show fraud, but they do indicate reliability issues and justify a downward adjustment to transparency and documentation confidence.
Audit Analysis
This project has some positive integrity signals, including VVB-confirmed additionality and a named verifier, but the evidence base is weakened by unresolved leakage treatment, no buffer pool information, and multiple corrective actions in the verification report. Transparency is limited by missing claimed/verified issuance figures and several key MRV details not stated in the extracted record.
Project Description
Developer: Alternate Power Systems (Pvt) Ltd Type: Small, Low - Impact Hydro Size: Small Scale Methodology: AMS-I.D. Grid connected renewable electricity generation Crediting period: 2010-08-24 → 2017-08-23 Estimated annual credits: 13484 tCO2e SDGs: Goal 13: Climate Action, Goal 7: Affordable and Clean Energy, Goal 8: Decent Work and Economic Growth
Red Flags
- Leakage is not addressed and no deduction is stated, which is a material gap for credit quality.
- The verification report lists four findings and required corrective actions, indicating unresolved documentation or implementation issues.
Credit Vintages
| Issued | Retired | Available | ||
|---|---|---|---|---|
| 2016 | 1,228 | 614 | 614 | |
| 2017 | 13,574 | 6,787 | 6,787 | |
| Total | 14,802 | 7,401 | 7,401 |
Cosa migliorerebbe questo punteggio
- Provide a quantified leakage assessment, including any deduction or justification for why leakage is negligible.
- Publish the verified issuance figures, buffer pool treatment, and a clear resolution of all CARs and CLs from the verification process.
Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.
Risk Indicators
VVB-confirmed investment test
No reversal detail or buffer pool stated
Leakage not addressed
Project baseline stated, reassessment not found
FPIC and benefit sharing present, grievance mechanism incons
CORSIA/CCP status not stated
Where to buy
+ Know where to buy this?
Listing multiple projects? Send us a CSV at [email protected].
⚑ Dispute this rating
Sei il proprietario di questo progetto?
Correzione metadati (gratuita)
Nome, paese, marketplace o link errati? Segnalacelo.
Non modifica lo score.
[email protected] →Rivalutazione con nuovi documenti
Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.
Invia Documenti →