Mordogan Wind Power Project, Turkey

VCS-1231 ↗

6.3 / 10
Integrity
6.7
Transparency
6.1
Claim Safety
6.4
Documentation
5.8

Score Breakdown

Integrity

verified Additionality was confirmed by the VVB using an investment test, and the latest issuance record reports no material findings or corrective actions.

missing The project uses a project-specific baseline and the record does not state when it was last reassessed; buffer pool coverage is also not found in the extracted documents.

Transparency

verified The latest issuance record provides a monitoring period, a named verifier, and matching claimed and verified issuance of 86,621 credits.

missing Several key transparency items are not stated, including the usage monitoring method and any public buffer or reassessment details; extraction confidence is only medium.

Claim Safety

verified The project is not CORSIA-eligible, which lowers dual-market claim risk, and the latest record shows no discrepancy between claimed and verified issuance.

missing The baseline is project-specific rather than jurisdictional, and the record contains contradictions on leakage treatment and credited volume versus earlier documents.

Documentation

verified Sixteen documents were used, including a recent issuance record dated 2024-09-12, and the latest record is relatively complete on core issuance fields.

missing The extracted record shows medium extraction confidence and multiple cross-document contradictions, which weakens documentation reliability.

Detailed Analysis

Integrity

The latest issuance record dated 2024-09-12 confirms additionality through an investment test and says the VVB found no material findings or required corrective actions. The project also reports no reversal events, which is favorable for permanence in an avoidance project like wind power. Still, the baseline is project-specific and the record does not state a buffer pool percentage or a baseline reassessment date, so the integrity case is solid but not exceptional.

Transparency

Transparency is helped by the named verifier, the stated monitoring period from 2021-03-01 to 2024-02-29, and the fact that claimed and verified issuance both equal 86,621 in the latest record. However, the usage monitoring method is not found in the extracted documents, and several supporting details are missing or only partially documented. The medium extraction confidence also suggests at least one key source was not fully legible.

Claim Safety

Claim safety is moderate because the project is not CORSIA-eligible and the latest issuance record shows no gap between claimed and verified credits. On the other hand, the baseline remains project-specific, and the contradiction log shows earlier documents with a different credited volume and a quantified leakage treatment, while the latest record says leakage is negligible. I privileged the latest issuance record for issuance and safeguard status because it is the most recent and authoritative document type for the current crediting claim.

Documentation

Documentation quality is fair: sixteen documents were used, the latest issuance record is recent, and the record includes core issuance and verification information. But the extracted record has medium confidence and multiple contradictions across documents, including differences in credited volume, crediting period, and safeguard disclosures. I privileged the 2024-09-12 issuance record over older documents because it is more recent and more specific to the current issuance decision.

Overall

Overall, this project appears credible but not low-risk: the latest issuance record supports additionality, no reversals, and clean verification, while missing baseline and monitoring details keep the score from being stronger. The contradictions must be noted explicitly: I privileged the 2024-09-12 issuance record over earlier documents for leakage treatment, safeguards, credited volume, and crediting period because it is the most recent and issuance-specific source, but the presence of these discrepancies reduces reliability. Under the stated gate rules, documentation is above 3.0 so no transparency cap applies, and integrity is above 4.0 so no overall cap applies.

Audit Analysis

This is a reasonably well-documented wind project with VVB-confirmed additionality, no reported reversals, and no material findings in the latest issuance record. However, several contradictions across documents reduce confidence, especially around credited volume, safeguards, and leakage treatment, so the claim should be treated as moderate rather than strong.

Project Description

Proponent: Egenda Ege Enerji Uretim A.S Protocol categories: Energy industries (renewable/non-renewable sources) Protocols: AMS-I.D. Estimated annual GHG reductions: 26593 tCO2e Region: Middle East Registration date: 2020-04-06

Red Flags

  • Earlier documents conflict with the latest issuance record on credited emissions, crediting period, and safeguard disclosures.
  • Leakage is described as negligible in the latest record, but an earlier document reportedly quantified it, creating a consistency issue.

Credit Vintages

Issued Retired Available
2016
15,588 15,588 0
2017
27,047 27,047 0
2018
26,624 26,624 0
2019
24,898 24,898 0
2020
28,488 0 28,488
2021
30,536 5,229 25,307
2022
30,871 0 30,871
2023
24,762 0 24,762
2024
5,681 0 5,681
Total 214,495 99,386 115,109

Cosa migliorerebbe questo punteggio

  • Publish a clear baseline reassessment history and the monitoring/usage calculation method in the latest issuance package.
  • Resolve the cross-document contradictions on credited volume, leakage treatment, and safeguard disclosures with a reconciled public note.

Questi suggerimenti indicano quali prove pubbliche aggiuntive potrebbero migliorare il livello di confidenza di questa valutazione. Non garantiscono un punteggio futuro più alto.

Risk Indicators

Additionality

VVB-confirmed investment test

Permanence

No reversals reported

Leakage

Negligible in latest record; earlier contradiction

Baseline

Project baseline; reassessment date missing

Safeguards

FPIC and grievance mechanism documented

Double-claim

Not CORSIA-eligible; no CCP approval stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis Provenance Scored 2026-04-19 General Methodology v2.0 Documentazione completa

Sei il proprietario di questo progetto?

Correzione metadati (gratuita)

Nome, paese, marketplace o link errati? Segnalacelo.

Non modifica lo score.

[email protected]

Rivalutazione con nuovi documenti

Hai documentazione aggiornata non ancora inclusa? Puoi richiedere un nuovo run della pipeline con i nuovi input.

Invia Documenti