Skip to main content
GSSmall, Low - Impact HydroTurkeyAMS-I.D

Daðdelen Weir and Hydro Power Plant

GS-1174 ↗ · current registry ID: GS749

#1166of 1935 in Renewable energy#220of 295 in Turkey#922of 1801 in Gold Standard (GS)#377of 806 in AMS-I.D

4.9/ 10
Integrity
5.5
Transparency
5.0
Claim Safety
4.5
Documentation
4.0

Audit Analysis

A small grid-connected hydro project in Turkey verified under Gold Standard with a combined additionality test and smart-meter monitoring. The project delivered roughly 4.3× the pro-rata annual expectation from the PDD's lifetime estimate, and the grid emission factor used in verification (0.596, 2018) is 29% higher than the PDD's (0.4616), both of which inflate credit volumes. Seventeen corrective action requests during verification and a low extraction confidence level point to documentation quality concerns.

Red Flags

  • Verified 2024 generation (6,884 tCO₂e) is approximately 4.3× the pro-rata annual expectation derived from the PDD's 7-year lifetime estimate (11,191 tCO₂e ÷ 7 ≈ 1,599 tCO₂e/yr), raising over-crediting concerns even after accounting for hydrological variability.
  • Grid emission factor used in the verification report (0.596 tCO₂/MWh, 2018) is 29% higher than the PDD's value (0.4616), directly inflating credit volumes per MWh generated.
  • Crediting period is stated as 2013–2019 in the verification report but 2020–2026 in the 2023 PDD, creating ambiguity about which period the 2024 monitoring actually falls under.
  • Seventeen corrective action requests were issued during verification (all closed), including missing meter documentation, an incorrect project name, and failure to use the latest Gold Standard MR template.

Credit Vintages

IssuedRetiredAvailable
2019
6,88406,884
Total6,88406,884

Risk Indicators

Additionality

Combined test in PDD; VVB confirmation not explicitly restated in verification report

Permanence

Avoidance-type hydro; no reversal events reported; no sequestration at risk

Leakage

0% deduction, deemed negligible—reasonable for grid-connected generation

Baseline

Jurisdictional grid baseline per PDD; grid EF from 2018; method label contradicts between documents

Safeguards

FPIC conducted, grievance mechanism in place, benefit-sharing described

Double-claim

CORSIA eligibility and CCP status not stated in available documents

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-09-01AMS-I.D. "Grid connected renewable electricity generation"

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.