Skip to main content
VCSWaste handling and disposalViet Nam Registry: RegisteredAMS-III.H

Dak Lak Wastewater Treatment with Biogas System and Methane Recovery

VCS-2860 ↗

#49of 111 in Biogas#19of 25 in Vietnam#435of 629 in Verra (VCS)#9of 22 in AMS-III.H

4.9/ 10
Integrity
5.5
Transparency
4.5
Claim Safety
5.0
Documentation
4.0

Audit Analysis

A VCS-registered wastewater-to-biogas project in Vietnam with a solid additionality assessment (combined test, VVB-verified) and inherently low permanence risk, but undermined by four contradictions between the PDD and validation report, a project-specific modeled baseline, absence of FPIC, and low extraction confidence across the document set. The ERR figures are internally consistent, and the 0% leakage deduction is reasonable for a biogas capture project, though the original PDD did not address leakage at all.

Red Flags

  • Four contradictions between the PDD (2021) and validation report (2023) on baseline type, additionality test, leakage treatment, and crediting period length — the PDD originally proposed a 21-year crediting period (2022–2043) while the registered period is only 7 years (2023–2030)
  • Free, Prior and Informed Consent (FPIC) was not conducted, despite the project treating community wastewater in Dak Lak province
  • Minimum extraction confidence is rated low, and one of the eight source documents is of unknown type, reducing reliability of the extracted record
  • Eight Corrective Action Requests were raised during validation (all closed), indicating the initial submission had notable gaps

Credit Vintages

No issuances recorded on the registry.

Risk Indicators

Additionality

Combined test, VVB-verified

Permanence

Biogas capture – no storage risk

Leakage

0% deduction, PDD originally silent

Baseline

Project-specific, modeled, no reassessment date

Safeguards

Grievance mechanism present, FPIC not conducted

Double-claim

CORSIA and CCP status not stated

Where to buy

+ Know where to buy this?

Listing multiple projects? Send us a CSV at [email protected].

⚑ Dispute this rating
Analysis ProvenanceScored2026-08-24AMS III.H

Are you the project owner?

Metadata correction (free)

Name, country, marketplace or links incorrect? Let us know.

Does not modify the score.

[email protected]

Pipeline re-run with new documents

Have updated documentation not yet included? You can request a new run of the pipeline with the new inputs.

Submit Documents